Current through October 31, 2024
Section 217.345 - [Effective 1/1/2025] [Effective until 12/31/2029] Monitoring and reporting requirements(a)PSO and PAM operator qualifications. LOA Holder must implement the following measures applicable to PSOs and PAM operators: (1) LOA Holder must use independent, NMFS-approved PSOs and PAM operators, meaning that the PSOs and PAM operators must be employed by a third-party observer provider, must have no tasks other than to conduct observational effort, collect data, and communicate with and instruct relevant crew with regard to the presence of protected species and mitigation requirements;(2) All PSOs and PAM operators must have successfully attained a bachelor's degree with a major in one of the natural sciences. The educational requirements may be waived if the PSO or PAM operator has acquired the relevant skills through a suitable amount of alternate experience. Requests for such a waiver must be submitted to NMFS Office of Protected Resources and must include written justification containing alternative experience. Alternate experience that may be considered includes, but is not limited to previous work experience conducting academic, commercial, or government-sponsored marine mammal visual and/or acoustic surveys, or previous work experience as a PSO/PAM operator;(3) PSOs must have visual acuity in both eyes (with correction of vision being permissible) sufficient enough to discern moving targets on the water's surface with the ability to estimate the target size and distance (binocular use is allowable); ability to conduct field observations and collect data according to the assigned protocols; sufficient training, orientation, or experience with the construction operation to provide for personal safety during observations; writing skills sufficient to document observations, including but not limited to, the number and species of marine mammals observed, the dates and times when in-water construction activities were conducted, the dates and time when in-water construction activities were suspended to avoid potential incidental take of marine mammals from construction noise within a defined shutdown zone, and marine mammal behavior; and the ability to communicate orally, by radio, or in-person, with project personnel to provide real-time information on marine mammals observed in the area;(4) All PSOs must be trained in northwestern Atlantic Ocean marine mammal identification and behaviors and must be able to conduct field observations and collect data according to assigned protocols. Additionally, PSOs must have the ability to work with all required and relevant software and equipment necessary during observations (as described in paragraphs (b)(6) and (8) of this section;(5) All PSOs and PAM operators must successfully complete a relevant training course within the last 5 years, including obtaining a certificate of course completion that must be submitted to NMFS. This requirement is waived for any PSOs and PAM operators that completed a relevant training course more than five years prior to seeking approval but have been working consistently as a PSO or PAM operator within the past five years;(6) PSOs are responsible for obtaining NMFS' approval. NMFS may approve PSOs as conditional or unconditional. A conditionally-approved PSO may be one who has completed training in the last 5 years but has not yet attained field experience. An unconditionally approved PSO is one who has completed training within the last 5 years and attained the necessary experience (i.e., demonstrate experience with monitoring for marine mammals at clearance and shutdown zone sizes similar to those produced during the respective activity). Lead PSOs must be unconditionally approved and have a minimum of 90 days in a northwestern Atlantic Ocean offshore environment performing the role (either visual or acoustic), with the conclusion of the most recent relevant experience not more than 18 months previous. A conditionally approved PSO must be paired with an unconditionally approved PSO;(7) PSOs for HRG surveys may be unconditionally or conditionally approved. PSOs for foundation installation activities must be unconditionally approved;(8) At least one on-duty PSO and PAM operator, where applicable, for each activity (e.g., impact pile driving, vibratory pile driving, and HRG surveys) must be designated as the Lead PSO or Lead PAM operator;(9) LOA Holder must submit previously approved PSOs and PAM operators to NMFS Office of Protected Resources for review and confirmation of their approval for specific roles at least 30 days prior to commencement of the activities requiring PSOs/PAM operators or 15 days prior to when new PSOs/PAM operators are required after activities have commenced;(10) For prospective PSOs and PAM operators not previously approved, or for PSOs and PAM operators whose approval is not current, LOA Holder must submit resumes for approval at least 60 days prior to PSO and PAM operator use. Resumes must include information related to relevant education, experience, and training, including dates, duration, location, and description of prior PSO or PAM operator experience. Resumes must be accompanied by relevant documentation of successful completion of necessary training;(11) PAM operators are responsible for obtaining NMFS approval. To be approved as a PAM operator, the person must meet the following qualifications: The PAM operator must have completed a PAM operator training course and demonstrate prior experience using PAM software, equipment, and real-time acoustic detection systems. They must demonstrate that they have prior experience independently analyzing archived and/or real-time PAM data to identify and classify baleen whale and other marine mammal vocalizations by species, including North Atlantic right whale and humpback whale vocalizations, and experience with deconflicting multiple species' vocalizations that are similar and/or received concurrently. PAM operators must be independent observers (i.e., not construction personnel), trained to use relevant project-specific PAM software and equipment, and must also be able test software and hardware functionality prior to beginning real-time monitoring. The PAM operator must be able to identify and classify marine mammal acoustic detections by species in real-time (prioritizing North Atlantic right whales and noting other marine mammal vocalizations, when detected). At a minimum, for each acoustic detection, the PAM operator must be able to categorically determine whether a North Atlantic right whale is detected, possibly detected, or not detected, and notify the Lead PSO of any confirmed or possible detections, including baleen whale detections that cannot be identified to species. If the PAM software is capable of localization of sounds or deriving bearings and distance, the PAM operator must demonstrate experience using this technique. A Lead PAM operator must meet all of these requirements and have a minimum of 90 days in the specified role or sufficient alternative experience;(12) PSOs may work as PAM operators and vice versa, pending NMFS-approval; however, they may only perform one role at any time and must not exceed work time restrictions, which must be tallied cumulatively; and(13) All PSOs and PAM operators must complete a Permits and Environmental Compliance Plan training and a 2-day refresher session that must be held with the PSO provider and Project compliance representative(s) prior to the start of in-water project activities (e.g., HRG survey, foundation installation, etc.).(b)General PSO and PAM operator requirements. The following measures apply to PSOs and PAM operators and must be implemented by LOA Holder:(1) PSOs must monitor for marine mammals prior to, during, and following impact pile driving and HRG surveys that use sub-bottom profilers (with specific monitoring durations and needs described in paragraphs (c) through (f) of this section, respectively). Monitoring must be done while free from distractions and in a consistent, systematic, and diligent manner;(2) PAM operator(s) must acoustically monitor for marine mammals prior to, during, and following all pile driving activities. PAM operators may be located on a vessel or remotely on-shore but must have the appropriate equipment (i.e., computer station equipped with a data collection software system available wherever they are stationed) and be in real-time communication with PSOs and transiting vessel captains. The PAM operator must monitor to and past the clearance zone for large whales;(3) For foundation installation, PSOs must visually clear (i.e., confirm no observations of marine mammals) the entire minimum visibility zone for a full 30 minutes immediately prior to commencing activities. For HRG surveys, which do not have a minimum visibility zone, the entire clearance zone must be visually cleared and as much of the Level B harassment zone as possible;(4) All PSOs must be located at the best vantage point(s) on any platform, as determined by the Lead PSO, in order to obtain 360-degree visual coverage of the entire clearance and shutdown zones around the activity area, and as much of the Level B harassment zone as possible. The PAM operator(s) must assist PSOs in ensuring full coverage of the clearance and shutdown zones;(5) All on-duty PSOs must remain in real-time contact with the on-duty PAM operator(s), PAM operators must immediately communicate all acoustic detections of marine mammals to PSOs, including any determination regarding species identification, distance, and bearing (where relevant) relative to the pile being driven and the degree of confidence (e.g., possible, probable detection) in the determination. All on-duty PSOs and PAM operator(s) must remain in contact with the on-duty construction personnel responsible for implementing mitigations (e.g., delay to pile driving) to ensure communication on marine mammal observations can easily, quickly, and consistently occur between all on-duty PSOs, PAM operator(s), and on-water project personnel;(6) The PAM operator must inform the Lead PSO(s) on duty of animal detections approaching or within applicable ranges of interest to the activity occurring via the data collection software system (i.e., Mysticetus or similar system) who must be responsible for requesting that the designated crewmember implement the necessary mitigation procedures (i.e., delay);(7) Any visual observations of marine mammals by any project personnel must be communicated immediately to on-duty PSOs and vessel captains associated with other project vessels to increase situational awareness;(8) PSOs must use high magnification (25x) binoculars, standard handheld (7x) binoculars, and the naked eye to search continuously for marine mammals. During foundation installation, at least two PSOs on the pile driving vessel must be equipped with functional Big Eye binoculars (e.g., 25 * 150; 2.7 view angle; individual ocular focus; height control); these must be pedestal mounted on the deck at the best vantage point that provides for optimal sea surface observation and PSO safety. A minimum of three on-duty PSOs must be active on a dedicated PSO vessel. PAM operators must have the appropriate equipment (i.e., a computer station equipped with a data collection software system available wherever they are stationed) in accordance with the NMFS-approved PAM Plan as described in § 217.344(c)(20);(9) PSOs and PAM operators must not exceed 4 consecutive watch hours on duty at any time, must have a 2-hour (minimum) break between watches, and must not exceed a combined watch schedule of more than 12 hours in a 24-hour period. If the schedule includes PSOs and PAM operators on-duty for 2-hour shifts, a minimum 1-hour break between watches must be allowed;(10) During periods of low visibility (e.g., darkness, rain, fog, poor weather conditions, etc.), PSOs must use alternative technology (e.g., infrared or thermal cameras) to monitor the clearance and shutdown zones as approved by NMFS; and(11) PSOs must remain in real-time contact with the PAM operators and construction personnel responsible for implementing mitigation (e.g., delay to pile driving) to ensure communication on marine mammal observations can easily, quickly, and consistently occur between all on-duty PSOs, PAM operator(s), and on-water project personnel(c)PSO and PAM operator requirements during WTG, OSS, and Met Tower foundation installation. The following measures apply to PSOs and PAM operators during WTG, OSS, and Met tower foundation installation and must be implemented by LOA Holder:(1) PSOs and PAM operator(s), using a NMFS-approved PAM system, must monitor for marine mammals 60 minutes prior to, during, and 30 minutes following all pile driving activities. If PSOs cannot visually monitor the minimum visibility zone prior to impact pile driving at all times using the equipment described in paragraphs (b)(6) and (7) of this section, pile driving operations must not commence or must shutdown if they are currently active;(2) At least three on-duty PSOs must be stationed and observing from the activity platform during impact pile driving and at least three on-duty PSOs must be stationed on each dedicated PSO vessel. There must be a minimum of three PSO observation platforms during impact pile driving. Concurrently, at least one PAM operator per acoustic data stream (equivalent to the number of acoustic buoys) must be actively monitoring for marine mammals 60 minutes before, during, and 30 minutes after impact pile driving in accordance with a NMFS-approved PAM Plan; and(3) LOA Holder must conduct PAM for at least 24 hours immediately prior to pile driving activities. The PAM operator must review all detections from the previous 24-hour period immediately prior to pile driving activities.(d)PSO requirements during HRG surveys. The following measures apply to PSOs during HRG surveys using acoustic sources that have the potential to result in harassment and must be implemented by LOA Holder:(1) At least one PSO must be on active duty monitoring during HRG surveys conducted during daylight (i.e., from 30 minutes prior to civil sunrise through 30 minutes following civil sunset) and two PSOs during nighttime surveying (if it occurs);(2) PSOs on HRG vessels must begin monitoring 30 minutes prior to activating acoustic sources, during the use of these acoustic sources, and for 30 minutes after use of these acoustic sources has ceased;(3) Any observations of marine mammals must be communicated to PSOs on all nearby survey vessels during concurrent HRG surveys; and(4) During daylight hours when survey equipment is not operating, LOA Holder must ensure that visual PSOs conduct, as rotation schedules allow, observations for comparison of sighting rates and behavior with and without use of the specified acoustic sources.(e)Monitoring requirements during fisheries monitoring surveys. The following measures apply during fisheries monitoring surveys and must be implemented by LOA Holder:(1) All captains and crew conducting fishery surveys must be trained in marine mammal detection and identification; and(2) Marine mammal monitoring must be conducted within 1 nmi from the planned survey location by the trained captain and/or a member of the scientific crew for 15 minutes prior to deploying gear, throughout gear deployment and use, and for 15 minutes after haul back.(f)Reporting. LOA Holder must comply with the following reporting measures: (1) Prior to initiation of any on-water project activities, LOA Holder must demonstrate in a report submitted to NMFS Office of Protected Resources that all required training for LOA Holder personnel (including the vessel crews, vessel captains, PSOs, and PAM operators) has been completed;(2) LOA Holder must use a standardized reporting system during the effective period of the LOA. All data collected related to the Project must be recorded using industry-standard software that is installed on field laptops and/or tablets. Unless stated otherwise, all reports must be submitted to NMFS Office of Protected Resources (PR.ITP.MonitoringReports@noaa.gov), dates must be in MM/DD/YYYY format, and location information must be provided in Decimal Degrees and with the coordinate system information (e.g., NAD83, WGS84, etc.);(3) For all visual monitoring efforts and marine mammal sightings, the following information must be collected and reported to NMFS Office of Protected Resources: the date and time that monitored activity begins or ends; the construction activities occurring during each observation period; the watch status (i.e., sighting made by PSO on/off effort, opportunistic, crew, alternate vessel/platform); the PSO who sighted the animal; the time of sighting; the weather parameters (e.g., wind speed, percent cloud cover, visibility); the water conditions (e.g., Beaufort sea state, tide state, water depth); all marine mammal sightings, regardless of distance from the construction activity; species (or lowest possible taxonomic level possible); the pace of the animal(s); the estimated number of animals (minimum/maximum/high/low/best); the estimated number of animals by cohort (e.g., adults, yearlings, juveniles, calves, group composition, etc.); the description (i.e., as many distinguishing features as possible of each individual seen, including length, shape, color, pattern, scars or markings, shape and size of dorsal fin, shape of head, and blow characteristics); the description of any marine mammal behavioral observations (e.g., observed behaviors such as feeding or traveling) and observed changes in behavior, including an assessment of behavioral responses thought to have resulted from the specific activity; the animal's closest distance and bearing from the pile being driven or specified HRG equipment and estimated time entered or spent within the Level A harassment and/or Level B harassment zone(s); the activity at time of sighting (e.g., impact pile driving, construction survey), use of any noise attenuation device(s), and specific phase of activity (e.g., ramp-up of HRG equipment, HRG acoustic source on/off, soft-start for pile driving, active pile driving, etc.); the marine mammal occurrence in Level A harassment or Level B harassment zones; the description of any mitigation-related action implemented, or mitigation-related actions called for but not implemented, in response to the sighting (e.g., delay, shutdown, etc.) and time and location of the action; other human activity in the area, and; other applicable information, as required in any LOAs issued under § 217.346;(4) LOA Holder must compile and submit weekly reports during foundation installation to NMFS Office of Protected Resources that document the type of pile, pile diameter, daily start and stop of all pile driving associated with the Project; the start and stop of associated observation periods by PSOs; hammer log (number of strikes, max hammer energy, duration of piling), any changes to noise attenuation systems and/or hammer schedule, details on the deployment of PSOs; a record of all detections of marine mammals (acoustic and visual); any mitigation actions (or if mitigation actions could not be taken, provide reasons why); and details on the noise attenuation system(s) used and its performance. Weekly reports must also include abbreviated SFV results. The weekly reports must also confirm that the required SFV was carried out for each pile and that results were reviewed on the required timelines. Weekly reports are due on Wednesday for the previous week (Sunday to Saturday) and must include the information required under this section. The weekly report must also identify which turbines become operational and when (a map must be provided). Once all foundation pile installation is completed, weekly reports are no longer required by LOA Holder;(5) LOA Holder must compile and submit monthly reports to NMFS Office of Protected Resources during foundation installation that include a summary of all information in the weekly reports, including project activities carried out in the previous month, vessel transits (number, type of vessel, MMIS number, and route), number of piles installed, all detections of marine mammals, and any mitigative action taken. Monthly reports are due on the 15th of the month for the previous month. The monthly report must also identify which turbines become operational and when (a map must be provided);(7) LOA Holder must submit a draft annual report to NMFS Office of Protected Resources no later than one year following date of LOA issuance within each given calendar year. LOA Holder must provide a final report within 30 days following resolution of NMFS' comments on the draft report. The draft and final reports must detail the following: the total number of marine mammals of each species/stock detected and how many were within the designated Level A harassment and Level B harassment zone(s) with comparison to authorized take of marine mammals for the associated activity type; marine mammal detections and behavioral observations before, during, and after each activity; what mitigation measures were implemented (i.e., number of shutdowns or clearance zone delays, etc.) or, if no mitigative actions was taken, why not; operational details (i.e., days and duration of impact and vibratory pile driving, days, and amount of HRG survey effort, etc.); any PAM systems used; the results, effectiveness, and which noise attenuation systems were used during relevant activities (i.e., impact pile driving); summarized information related to situational reporting; and any other important information relevant to the Project, including additional information that may be identified through the adaptive management process;(8) LOA Holder must submit its draft 5-year report to NMFS Office of Protected Resources on all visual and acoustic monitoring conducted within 90 calendar days of the completion of activities occurring under the LOA. At a minimum, the draft and final 5-year report must include: the total number (annually and across all 5 years) of marine mammals of each species/stock detected and how many were detected within the designated Level A harassment and Level B harassment zone(s) with comparison to authorized take of marine mammals for the associated activity type; a summary table(s) indicating the amount of each activity type (e.g., pile installation, HRG) completed in each of the 5 years and total; GIS shapefile(s) of the final location of all piles, cable routes, and other permanent structures including an indication of what year installed and began operating; GIS shapefile of all North Atlantic right whale sightings, including dates and group sizes; a 5-year summary and evaluation of all SFV data collected; a 5-year summary and evaluation of all PAM data collected; a 5-year summary and evaluation of marine mammal behavioral observations; a 5-year summary and evaluation of mitigation and monitoring implementation and effectiveness; a list of recommendations to inform environmental compliance assessments for future offshore wind actions. A 5-year report must be prepared and submitted within 60 calendar days following receipt of any NMFS Office of Protected Resources comments on the draft report. If no comments are received from NMFS Office of Protected Resources within 60 calendar days of NMFS Office of Protected Resources receipt of the draft report, the report shall be considered final;(9) For those foundation piles requiring SFV measurements, LOA Holder must provide the initial results of the SFV measurements to NMFS Office of Protected Resources in an interim report after each foundation installation event as soon as they are available and prior to a subsequent foundation installation, but no later than 48 hours after the installation of each pile for which thorough SFV is carried out. The report must include, at minimum: a summary of pile installation activities (pile diameter, pile weight, pile length, water depth, sediment type, total installation time [start time, end time], duration of pile driving), hammer energies/schedule used during pile driving, including, the total number of strikes and the maximum hammer energy; the model-estimated acoustic ranges (R95% ) to compare with the real-world sound field measurements; peak sound pressure level (SPLpk), root-mean-square sound pressure level that contains 90 percent of the acoustic energy (SPLrms), and sound exposure level (SEL, in single strike for pile driving, SELss,), for each hydrophone, including at least the maximum, arithmetic mean, minimum, median (L50) and L5 (95 percent exceedance) statistics for each metric; estimated marine mammal Level A harassment and Level B harassment isopleths, calculated using the maximum-over-depth L5 (95 percent exceedance level, maximum of both hydrophones) of the associated sound metric; comparison of modeled results assuming 10-dB attenuation against the measured marine mammal Level A harassment and Level B harassment acoustic isopleths; estimated transmission loss coefficients; pile identifier name, location of the pile and each hydrophone array location in latitude/longitude; depths of each hydrophone; one-third-octave band single strike SEL spectra; if filtering is applied, full filter characteristics must be reported; and hydrophone specifications including the type, model, and sensitivity. LOA Holder must also report any immediate observations which are suspected to have a significant impact on the results including but not limited to: observed noise mitigation system issues, obstructions along the measurement transect, and technical issues with hydrophones or recording devices. If any in-situ calibration checks for hydrophones reveal a calibration drift greater than 0.75 dB, pistonphone calibration checks are inconclusive, or calibration checks are otherwise not effectively performed, LOA Holder must indicate full details of the calibration procedure, results, and any associated issues in the 48-hour interim reports;. All abbreviated SFV reports must include the results from the hydrophones at 750m and a comparison to the expected levels at 750 m based on the previously completed thorough SFV for comparable pile type and installation method.;(10) The final results of SFV measurements from each foundation installation must be submitted as soon as possible, but no later than 90 days following completion of each event's SFV measurements. The final reports must include all details prescribed above for the interim report as well as, at minimum, the following: the peak sound pressure level (SPLpk), the root-mean-square sound pressure level that contains 90 percent of the acoustic energy (SPLrms), the single strike sound exposure level (SELss), the integration time for SPLrms, the spectrum, and the 24-hour cumulative SEL extrapolated from measurements at all hydrophones. The final report must also include at least the maximum, mean, minimum, median (L50) and L5 (95 percent exceedance) statistics for each metric; the SEL and SPL power spectral density and/or one-third octave band levels (usually calculated as decidecade band levels) at the receiver locations should be reported; the sound levels reported must be in median, arithmetic mean, and L5 (95 percent exceedance) (i.e., average in linear space), and in dB; range of transmission loss coefficients; the local environmental conditions, such as wind speed, transmission loss data collected on-site (or the sound velocity profile); baseline pre- and post-activity ambient sound levels (broadband and/or within frequencies of concern); a description of depth and sediment type, as documented in the Construction and Operation Plan, at the recording and foundation installation locations; the extents of the measured Level A harassment and Level B harassment zone(s); hammer energies required for pile installation and the number of strikes per pile; the hydrophone equipment and methods (i.e., recording device, bandwidth/sampling rate; distance from the pile where recordings were made; the depth of recording device(s)); a description of the SFV measurement hardware and software, including software version used, calibration data, bandwidth capability and sensitivity of hydrophone(s), any filters used in hardware or software, any limitations with the equipment, and other relevant information; the spatial configuration of the noise attenuation device(s) relative to the pile; a description of the noise abatement system and operational parameters (e.g., bubble flow rate, distance deployed from the pile, etc.), and any action taken to adjust the noise abatement system. A discussion which includes any observations which are suspected to have a significant impact on the results including but not limited to: observed noise mitigation system issues, obstructions along the measurement transect, and technical issues with hydrophones or recording devices;(11) If at any time during the Project LOA Holder becomes aware of any issue or issues which may (to any reasonable subject-matter expert, including the persons performing the measurements and analysis) call into question the validity of any measured Level A harassment or Level B harassment isopleths to a significant degree, which were previously transmitted or communicated to NMFS Office of Protected Resources, LOA Holder must inform NMFS Office of Protected Resources within 1 business day of becoming aware of this issue or before the next pile is driven, whichever comes first;(12) Performance reports for each bubble curtain deployed must include water depth, current speed and direction, wind speed and direction, bubble curtain deployment/retrieval date and time, bubble curtain hose length, bubble curtain radius (distance from pile), diameter of holes and hole spacing, air supply hose length, compressor type (including rated cubic feet per minute (CFM) and model number), number of operational compressors, performance data from each compressor (including revolutions per minute (RPM), pressure, start times, and stop times), free air delivery (m3 /min), total hose air volume (m3 /(min m)), schematic of GPS waypoints during hose laying, maintenance procedures performed (pressure tests, inspections, flushing, re-drilling, and any other hose or system maintenance) before and after installation and the time and date of each of these procedures, and the length of time the bubble curtain was on the seafloor prior to foundation installation. Additionally, the report must include any important observations regarding performance (before, during, and after pile installation), such as any observed weak areas of low pressure. The report may also include any relevant video and/or photographs of the bubble curtain(s) operating during pile driving;(13) If a North Atlantic right whale is acoustically detected at any time by a project-related PAM system, LOA Holder must ensure the detection is reported as soon as possible to NMFS, but no longer than 24 hours after the detection via the "24-hour North Atlantic right whale Detection Template" (https://www.fisheries.noaa.gov/resource/document/passive-acoustic-reporting-system-templates). Calling the hotline is not necessary when reporting PAM detections via the template;(14) Full detection data, metadata, and location of recorders (or GPS tracks, if applicable) from all real-time hydrophones used for monitoring during construction must be submitted within 90 calendar days after pile driving has ended and instruments have been pulled from the water. Reporting must use the webform templates on the NMFS Passive Acoustic Reporting System website at https://www.fisheries.noaa.gov/resource/document/passive-acoustic-reporting-system-templates. Submit the completed data templates to nmfs.nec.pacmdata@noaa.gov. The full acoustic recordings from all real-time hydrophones must also be sent to the National Centers for Environmental Information for archiving within 90 calendar days following completion of activities requiring PAM for mitigation. Submission details can be found at: https://www.ncei.noaa.gov/products/passive-acoustic-data;(15) LOA Holder must submit situational reports if the following circumstances occur (including all instances wherein an exemption is taken must be reported to NMFS Office of Protected Resources within 24 hours):(i) If a North Atlantic right whale is observed at any time by PSOs or project personnel, LOA Holder must ensure the sighting is immediately (if not feasible, as soon as possible, and no longer than 24 hours after the sighting) reported to NMFS and the Right Whale Sightings Advisory System (RWSAS). If in the Northeast Region (Maine to Virginia/North Carolina border) call (866-755-6622). If in the Southeast Region (North Carolina to Florida) call (877-WHALE-HELP or 877-942-5343). If calling NMFS is not possible, reports can also be made to the U.S. Coast Guard via channel 16 or through the WhaleAlert app (https://www.whalealert.org). The sighting report must include the time, date, and location of the sighting, number of whales, animal description/certainty of sighting (provide photos/video if taken), Lease Area/project name, PSO/personnel name, PSO provider company (if applicable), and reporter's contact information;(ii) If a North Atlantic right whale is observed at any time by PSOs or project personnel, LOA Holder must submit a summary report to GARFO (nmfs.gar.incidental-take@noaa.gov) and NMFS Office of Protected Resources, and NMFS Northeast Fisheries Science Center (NEFSC; ne.rw.survey@noaa.gov) within 24 hours with the above information and the vessel/platform from which the sighting was made, activity the vessel/platform was engaged in at time of sighting, project construction and/or survey activity at the time of the sighting (e.g., pile driving, cable installation, HRG survey), distance from vessel/platform to sighting at time of detection, and any mitigation actions taken in response to the sighting;(iii) If an observation of a large whale occurs during vessel transit, LOA Holder must report the time, date, and location of the sighting; the vessel's activity, heading, and speed (knots); Beaufort sea state, water depth (meters), and visibility conditions; marine mammal species identification to the best of the observer's ability and any distinguishing characteristics; initial distance and bearing to marine mammal from vessel and closest point of approach; and any avoidance measures taken in response to the marine mammal sighting;(iv) In the event that personnel involved in the Project discover a stranded, entangled, injured, or dead marine mammal, LOA Holder must immediately report the observation to NMFS. If in the Greater Atlantic Region (Maine to Virginia) call the NMFS Greater Atlantic Stranding Hotline (866-755-6622); if in the Southeast Region (North Carolina to Florida), call the NMFS Southeast Stranding Hotline (877-942-5343). Separately, LOA Holder must report the incident to NMFS Office of Protected Resources (PR.ITP.MonitoringReports@noaa.gov) and, if in the Greater Atlantic region (Maine to Virginia), GARFO (nmfs.gar.incidental-take@noaa.gov, nmfs.gar.stranding@noaa.gov) or, if in the Southeast region (North Carolina to Florida), NMFS Southeast Regional Fisheries Office (SERO; secmammalreports@noaa.gov) as soon as feasible. The report (via phone or email) must include contact (name, phone number, etc.), the time, date, and location of the first discovery (and updated location information if known and applicable); species identification (if known) or description of the animal(s) involved; condition of the animal(s) (including carcass condition if the animal is dead); observed behaviors of the animal(s), if alive; if available, photographs or video footage of the animal(s); and general circumstances under which the animal was discovered;(v) In the event of a vessel strike of a marine mammal by any vessel associated with the Project or if other project activities cause a non-auditory injury or death of a marine mammal, LOA Holder must immediately report the incident to NMFS. If in the Greater Atlantic Region (Maine to Virginia) call the NMFS Greater Atlantic Stranding Hotline (866-755-6622) and if in the Southeast Region (North Carolina to Florida) call the NMFS Southeast Stranding Hotline (877-942-5343). Separately, LOA Holder must immediately report the incident to NMFS Office of Protected Resources (PR.ITP.MonitoringReports@noaa.gov) and, if in the Greater Atlantic region (Maine to Virginia), NMFS GARFO (nmfs.gar.incidental-take@noaa.gov, nmfs.gar.stranding@noaa.gov) or, if in the Southeast region (North Carolina to Florida), NMFS SERO (secmammalreports@noaa.gov). The report must include the time, date, and location of the incident; species identification (if known) or description of the animal(s) involved; vessel size and motor configuration (inboard, outboard, jet propulsion); vessel's speed leading up to and during the incident; vessel's course/heading and what operations were being conducted (if applicable); status of all sound sources in use; description of avoidance measures/requirements that were in place at the time of the strike and what additional measures were taken, if any, to avoid strike; environmental conditions (e.g., wind speed and direction, Beaufort sea state, cloud cover, visibility) immediately preceding the strike; estimated size and length of animal that was struck; description of the behavior of the marine mammal immediately preceding and following the strike; if available, description of the presence and behavior of any other marine mammals immediately preceding the strike; estimated fate of the animal (e.g., dead, injured but alive, injured and moving, blood or tissue observed in the water, status unknown, disappeared); and to the extent practicable, photographs or video footage of the animal(s). LOA Holder must immediately cease all on-water activities until the NMFS Office of Protected Resources is able to review the circumstances of the incident and determine what, if any, additional measures are appropriate to ensure compliance with the terms of the LOA. NMFS Office of Protected Resources may impose additional measures to minimize the likelihood of further prohibited take and ensure MMPA compliance. LOA Holder may not resume their activities until notified by NMFS Office of Protected Resources; and(16) LOA Holder must report any lost gear associated with the fishery surveys to the NOAA GARFO Protected Resources Division (nmfs.gar.incidental-take@noaa.gov) as soon as possible or within 24 hours of the documented time of missing or lost gear. This report must include information on any markings on the gear and any efforts undertaken or planned to recover the gear. 89 FR 84715 , 1/1/2025 through 12/31/2029