49 C.F.R. § 239 app A to Part 239

Current through May 31, 2024
Appendix A to Part 239 - Schedule of Civil Penalties

SectionViolationWillful violation
Subpart B-Specific Requirements:
239.101(a) Failure of a railroad to adopt a written or electronic emergency preparedness plan7,50011,000
(a)(1) Failure of the plan to provide for:
(i) Initial or on-board notifications by an on-board crewmember2,5005,000
(ii) Notification of outside emergency responders by control center or ERCC2,5005,000
(iii) Failure to designate employee responsible for maintaining current emergency telephone numbers for use in notifications2,5005,000
(a)(2) Failure of the plan to provide for:
(i) Initial or periodic training of on-board personnel2,5005,000
(ii) Initial or periodic training of control center and ERCC personnel2,5005,000
(iii) Completion of initial training of each on-board, control center, and ERCC personnel by the specified date2,5005,000
(iv) Completion of initial training of each newly-hired on-board, control center, and ERCC personnel by the specified date2,5005,000
(v) Adequate procedures to evaluate and test on-board, control center, and ERCC personnel for qualification under the emergency preparedness plan2,5005,000
(vi) Adequate on-board staffing2,5005,000
(a)(3) Failure of a host railroad involved in joint operations to coordinate applicable portions of the emergency preparedness plan with the railroad or railroads providing or operating a passenger train service operation3,0006,000
(a)(4) Failure of the plan to address:
(i) Readiness procedures for emergencies in tunnels2,5005,000
(ii) Readiness procedures for emergencies on an elevated structure or in electrified territory2,5005,000
(iii) Coordination efforts involving adjacent rail modes of transportation2,5005,000
(a)(5) Failure of the plan to address relationships with on-line emergency responders by providing for:
(i) The development and availability of training programs3,0006,000
(ii) Invitations to emergency responders to participate in emergency simulations3,0006,000
(iii) Distribution of applicable portions of the current emergency preparedness plan3,0006,000
(a)(6) Failure of the plan to provide for, or the railroad to include on board each train and maintain and replace:
(i) Emergency equipment2,5005,000
(ii) First-aid kits2,5005,000
(iii) Emergency lighting2,5005,000
(a)(7) Failure of the plan to provide for emergency instructions inside each passenger car or to include additional safety awareness information3,5007,000
(a)(8) Failure of the plan to include procedures promoting the safety of passengers with disabilities2,5005,000
239.103 Failure to conduct a required full-scale simulation in accordance with the frequency schedule5,0007,500
239.105 Debriefing and critique
(a) Failure to conduct a debriefing and critique session after an emergency or full-scale simulation4,0007,500
(c) Failure to design the debrief and critique session to determine the five items specified2,5005,000
(d)(1) Failure to maintain a record2,5005,000
(i) Failure to include date or location of the emergency or simulation1,0002,000
(ii) Failure to include date or location of the debriefing and critique session1,0002,000
(iii) Failure to include names of participants in the debriefing and critique session1,0002,000
(d)(2) Failure to make record available1,0002,000
Subpart C-Review, Approval, and Retention of Emergency Preparedness Plans:
239.201 Filing and approval
(a):
(i) Failure of a railroad to file a written emergency preparedness plan5,0007,500
(ii) Failure to designate a primary person to contact for plan review1,0002,000
(iii) Failure of a railroad to file an amendment to its plan2,5005,000
(iv) Failure of a railroad to file a summary of an amendment to its plan1,0002,000
(b)(1), (b)(2):
(i) Failure of a railroad to correct a plan deficiency2,5005,000
(ii) Failure to provide FRA with a corrected copy of the plan1,0002,000
(b)(3):
(i) Failure of a railroad to correct an amendment deficiency2,5005,000
(ii) Failure to file a corrected plan amendment with FRA1,0001,000
239.203 Retention of emergency preparedness plan
(1) Failure to retain a copy of the plan or an amendment to the plan2,5005,000
(2) Failure to make record available1,0002,000
Subpart D-Operational Tests and Inspections; Records, Recordkeeping, and Availability of Records
239.301 Operational tests and inspections
(a) Failure to periodically conduct operational tests and inspections of applicable personnel in accordance with program of operational tests and inspections2,5005,000
(a)(1) Failure to adopt a program of operational tests and inspections that meets the minimum requirements within 30 days of commencing rail operations5,0007,500
(a)(1)(vi) Failure to train or qualify each railroad officer who conducts operational tests and inspections on aspects of the e-prep plan and program procedures relevant to the operational tests and inspections that the officer conducts2,5005,000
(b)(1) Failure to maintain a record2,5005,000
(b)(2) Record improperly completed1,0001,000
(c)(1), (d)(1), (e)(2), (f)(1): Failure to retain a copy of the record2,5005,000
(c)(2), (d)(2), (e)(3), (f)(2): Failure to make record available1,0002,000
(e)(1) Failure to conduct six-month review and analysis of required data and make any necessary or appropriate adjustments to the program of operational tests and inspections4,0007,500
239.303 Electronic recordkeeping
(a) Insufficient limits or controls on accessibility to records2,5005,000
(b) Missing terminal1,0002,000
(c) Inability of railroad to produce information in a usable format for immediate review1,0002,000
(d) Failure by railroad to designate an authorized representative1,0002,000
(e) Failure to make record available1,0002,000

1A penalty may be assessed against an individual only for a willful violation. The Administrator reserves the right to assess a penalty of up to the statutory maximum amount for any violation where circumstances warrant. See 49 CFR part 209, appendix A.

2The penalty schedule uses section numbers from 49 CFR part 239. If more than one item is listed as a type of violation of a given section, each item is also designated by a "penalty code," which is used to facilitate assessment of civil penalties, and which may or may not correspond to any subsection designation(s). For convenience, penalty citations will cite the CFR section and the penalty code, if any. FRA reserves the right, should litigation become necessary, to substitute in its complaint the CFR citation in place of the combined CFR and penalty code citation, should they differ.

49C.F.R. 239 app A to Part 239

63 FR 24676, 5/4/1998, as amended at 69 FR 30595, 5/28/2004; 73 FR 79704, 12/30/2008; 77 FR 24422, 4/24/2012; 78 FR 71816, 11/29/2013; 79 FR 18150, 3/31/2014; 81 FR 43112, 8/1/2016; 83 FR 60749, 11/27/2018