49 C.F.R. § 230.59

Current through September 30, 2024
Section 230.59 - Fusible plugs

If boilers are equipped with fusible plugs, the plugs shall be removed and cleaned of scale each time the boiler is washed but not less frequently than during every 31 service day inspection. Their removal shall be noted on the FRA Form No. 1 or FRA Form No. 3. (See appendix B of this part.)

49 C.F.R. § 230.59