49 C.F.R. § 195.100

Current through October 31, 2024
Section 195.100 - Scope

This subpart prescribes minimum design requirements for new pipeline systems constructed with steel pipe and for relocating, replacing, or otherwise changing existing systems constructed with steel pipe. However, it does not apply to the movement of line pipe covered by § 195.424 .

49 C.F.R. §195.100