Browse as ListSearch Within- Section 52.01-1 - [Effective 9/10/2024] Incorporation by reference
- Section 52.01-1 - [Effective until 9/10/2024] Incorporation by reference
- Section 52.01-2 - [Effective 9/10/2024] Adoption of Section I of the ASME BPVC
- Section 52.01-2 - [Effective until 9/10/2024] Adoption of section I of the ASME Boiler and Pressure Vessel Code
- Section 52.01-3 - [Effective 9/10/2024] Definitions of terms used in this part
- Section 52.01-3 - [Effective until 9/10/2024] Definitions of terms used in this part
- Section 52.01-5 - [Effective 9/10/2024] Plans
- Section 52.01-5 - [Effective until 9/10/2024] Plans
- Section 52.01-10 - [Effective 9/10/2024] Automatic controls
- Section 52.01-10 - [Effective until 9/10/2024] Automatic controls
- Section 52.01-35 - [Effective 9/10/2024] Auxiliary, donkey, fired thermal fluid heater, and heating boilers
- Section 52.01-35 - [Effective until 9/10/2024] Auxiliary, donkey, fired thermal fluid heater, and heating boilers
- Section 52.01-40 - [Effective 9/10/2024] Materials and workmanship
- Section 52.01-40 - [Effective until 9/10/2024] Materials and workmanship
- Section 52.01-50 - [Effective 9/10/2024] Fusible plugs (modifies A-19 through A-21)
- Section 52.01-50 - [Effective until 9/10/2024] Fusible plugs (modifies A-19 through A-21)
- Section 52.01-55 - [Effective 9/10/2024] Maximum allowable working pressure
- Section 52.01-55 - [Effective until 9/10/2024] Increase in maximum allowable working pressure
- Section 52.01-90 - [Effective 9/10/2024] Materials
- Section 52.01-90 - [Effective until 9/10/2024] Materials (modifies PG-5 through PG-13)
- Section 52.01-95 - [Effective 9/10/2024] Design (modifies PG-16 through PG-31 and PG-100)
- Section 52.01-95 - [Effective until 9/10/2024] Design (modifies PG-16 through PG-31 and PG-100)
- Section 52.01-100 - [Effective 9/10/2024] Openings and compensation (modifies PG-32 through PG-39, PG-42 through PG-55)
- Section 52.01-100 - [Effective until 9/10/2024] Openings and compensation (modifies PG-32 through PG-39, PG-42 through PG-55)
- Section 52.01-105 - [Effective 9/10/2024] Piping, valves and fittings (modifies PG-58 and PG-59)
- Section 52.01-105 - [Effective until 9/10/2024] Piping, valves and fittings (modifies PG-58 and PG-59)
- Section 52.01-110 - [Effective 9/10/2024] Water-level indicators, water columns, gauge-glass connections, gauge cocks, and pressure gauges (modifies PG-60)
- Section 52.01-110 - [Effective until 9/10/2024] Water-level indicators, water columns, gauge-glass connections, gauge cocks, and pressure gauges (modifies PG-60)
- Section 52.01-115 - [Effective 9/10/2024] Feedwater supply (modifies PG-61)
- Section 52.01-115 - [Effective until 9/10/2024] Feedwater supply (modifies PG-61)
- Section 52.01-120 - [Effective 9/10/2024] Safety valves and safety relief valves (modifies PG-67 through PG-73)
- Section 52.01-120 - [Effective until 9/10/2024] Safety valves and safety relief valves (modifies PG-67 through PG-73)
- Section 52.01-130 - [Effective 9/10/2024] Installation
- Section 52.01-130 - [Effective until 9/10/2024] Installation
- Section 52.01-135 - [Effective 9/10/2024] Inspection and tests (modifies PG-90 through PG-100)
- Section 52.01-135 - [Effective until 9/10/2024] Inspection and tests (modifies PG-90 through PG-100)
- Section 52.01-140 - [Effective 9/10/2024] Certification by stamping (modifies PG-104 through PG-113)
- Section 52.01-140 - [Effective until 9/10/2024] Certification by stamping (modifies PG-104 through PG-113)
- Section 52.01-145 - [Effective 9/10/2024] Manufacturers' data report forms (modifies PG-112 and PG-113)
- Section 52.01-145 - [Effective until 9/10/2024] Manufacturers' data report forms (modifies PG-112 and PG-113)