43 C.F.R. § 3802.1-1

Current through September 30, 2024
Section 3802.1-1 - When required

An approved plan of operations is required for operations within lands under wilderness review prior to commencing:

(a) Any mining operations which involve construction of means of access, including bridges, landing areas for aircraft, or improving or maintaining such access facilities in a way that alters the alignment, width, gradient size, or character of such facilities;
(b) Any mining operations which destroy trees 2 or more inches in diameter at the base;
(c) Mining operations using tracked vehicles or mechanized earth moving equipment, such as bulldozers or backhoes;
(d) Any operations using motorized vehicles over other than open use areas and trails as defined in subpart 6292 of this title, off-road vehicles, unless the use of a motorized vehicle can be covered by a temporory use permit issued under part 2930 of this chapter;
(e) The construction or placing of any mobile, portable or fixed structure on public land for more than 30 days;
(f) On mining operations requiring the use of explosives; or
(g) Any operation which may cause changes in a water course.

43 C.F.R. §3802.1-1

45 FR 13974, Mar. 3, 1980, as amended at 67 FR 61745, Oct. 1, 2002