43 C.F.R. § 3274.11

Current through November 30, 2024
Section 3274.11 - What must I give BLM to approve my commercial use permit application?

Submit a completed and signed commercial permit form, to BLM, containing the following information:

(a) The design specifications, and the inspection and calibration schedule of production, injection, and royalty meters;
(b) A schematic diagram of the utilization site or individual well, showing the location of each production and royalty meter. If the sales point is located off the utilization site, give us a generalized schematic diagram of the electrical transmission or pipeline system, including meter locations;
(c) A copy of the sales contract for the sale and/or utilization of geothermal resources;
(d) A description and analysis of reservoir, production, and injection characteristics, including the flow rates, temperatures, and pressures of each production and injection well;
(e) A schematic diagram of each production and injection well showing the wellhead configuration, including meters;
(f) A schematic flow diagram of the utilization facility, including interconnections with other facilities, if applicable;
(g) A description of the utilization process in sufficient detail to enable BLM to determine whether the resource will be utilized in a manner consistent with law and regulations;
(h) The planned safety provisions for emergency shutdown to protect public health, safety, property, and the environment. This should include a schedule for the testing and maintenance of safety devices;
(i) The environmental and operational parameters that will be monitored during the operation of the facility and/or well(s); and
(j) Any additional information or data that we may require.

43 C.F.R. § 3274.11