Table 1 to § 3176.8(a)(1)
Violation | Corrective action | Normal abatement period |
Minor | Make copy of Plan available | 24 hours. |
Table 2 to § 3176.8(a)(2)
Violation | Corrective action | Normal abatement period |
Major | Implement H2S operational requirements, such as completion of training and/or installation, repair, or replacement of equipment, as necessary | Prompt correction required. |
Table 3 to § 3176.8(a)(3)(i)
Violation | Corrective action | Normal abatement period |
Major | Implement H2S operational requirements, as applicable | Prompt correction required. |
Table 4 to § 3176.8(a)(3)(ii)
Violation | Corrective action | Normal abatement period |
Minor | Notify authorized officer | 24 hours. |
Table 5 to § 3176.8(a)(3)(iii)
Violation | Corrective action | Normal abatement period |
Minor | Submit plans to authorized officer | 5 days. |
Table 6 to § 3176.8(b)(1)
Violation | Corrective action | Normal abatement period |
Minor | Designate or establish an alternate escape route | 24 hours. |
Table 7 to § 3176.8(b)(2)
Violation | Corrective action | Normal abatement period |
Minor | Make alternate escape route passable | 24 hours. |
Table 8 to § 3176.8(b)(3)
Violation | Corrective action | Normal abatement period |
Minor | Designate secondary means of egress | 24 hours. |
Table 9 to § 3176.8(c)(1)
Violation | Corrective action | Normal abatement period |
Major | Train all personnel and conduct drills | Prompt correction required. |
Table 10 to § 3176.8(c)(1)(i)
Violation | Corrective action | Normal abatement period |
Minor | Record on driller's log or equivalent | 24 hours. |
Table 11 to § 3176.8(c)(1)(ii)
Violation | Corrective action | Normal abatement period |
Major | Designate briefing areas | 24 hours. |
Table 12 to § 3176.8(c)(1)(iii)
Violation | Corrective action | Normal abatement period |
Minor | Designate safety responsibilities | 24 hours. |
Table 13 to § 3176.8(c)(2)(i)
Violation | Corrective action | Normal abatement period |
Major | Acquire, repair, or replace equipment, as necessary | Prompt correction required. |
Table 14 to § 3176.8(c)(2)(ii)
Violation | Corrective action | Normal abatement period |
Major | Acquire or rearrange equipment, as necessary | Prompt correction required. |
Table 15 to § 3176.8(c)(2)(iii)
Violation | Corrective action | Normal abatement period |
Major | Acquire, repair, or replace equipment | 24 hours. |
Table 16 to § 3176.8(c)(3)(i)
Violation | Corrective action | Normal abatement period |
Major | Install, repair, calibrate, or replace equipment, as necessary | Prompt correction required. |
Table 17 to § 3176.8(c)(3)(ii)
Violation | Corrective action | Normal abatement period |
Minor | Record on driller's log or equivalent | 24 hours. |
Table 18 to § 3176.8(c)(3)(iii)
Violation | Corrective action | Normal abatement period |
Major | Install, repair, calibrate, or replace equipment, as necessary | Prompt correction required. |
Table 19 to § 3176.8(c)(4)(i)
Violation | Corrective action | Normal abatement period |
Minor | Install, repair, move, or replace wind direction indicator(s), as necessary | 24 hours. |
Table 20 to § 3176.8(c)(4)(ii)
Violation | Corrective action | Normal abatement period |
Minor | Erect appropriate signs | 24 hours. |
Table 21 to § 3176.8(c)(4)(iii)
Violation | Corrective action | Normal abatement period |
Minor | Replace or alter sign, as necessary | 5 to 20 days. |
Table 22 to § 3176.8(c)(4)(iv)
Violation | Corrective action | Normal abatement period |
Major | Replace, alter, or move sign, as necessary | 24 hours. |
Table 23 to § 3176.8(c)(4)(v)
Violation | Corrective action | Normal abatement period |
Minor | Alter sign(s), as necessary | 5 to 20 days. |
Table 24 to § 3176.8(c)(4)(vi)
Violation | Corrective action | Normal abatement period |
Major | Erect or move sign(s) and/or flag(s), as necessary | 24 hours. |
Table 25 to § 3176.8(c)(4)(vii)
Violation | Corrective action | Normal abatement period |
Major | Display red flag | Prompt correction required. |
Table 26 to § 3176.8(c)(5)
Violation | Corrective action | Normal abatement period |
Major | Move non-essential personnel to safe area and mask-up essential personnel | Prompt correction required. |
Table 27 to § 3176.8(d)(1)(i)
Violation | Corrective action | Normal abatement period |
Major | Convert to appropriate fluid medium | Prompt correction required. |
Table 28 to § 3176.8(d)(1)(ii)
Violation | Corrective action | Normal abatement period |
Major | Install flare system | Prompt correction required. |
Table 29 to § 3176.8(d)(1)(iii)
Violation | Corrective action | Normal abatement period |
Minor | Adjust flare line(s) as necessary | 24 hours. |
Table 30 to § 3176.8(d)(1)(iv)
Violation | Corrective action | Normal abatement period |
Major | Install, repair, or replace equipment, as necessary | 24 hours. |
Table 31 to § 3176.8(d)(1)(v)
Violation | Corrective action | Normal abatement period |
Major | Acquire supplemental fuel | 24 hours. |
Table 32 to § 3176.8(d)(1)(vi)
Violation | Corrective action | Normal abatement period |
Minor | Acquire, repair, or replace equipment as necessary | 24 hours to 3 days. |
Table 33 to § 3176.8(d)(1)(vii)
Violation | Corrective action | Normal abatement period |
Major | Contain SO2 release and/or implement Public Protection Plan | Prompt correction required. |
Table 34 to § 3176.8(d)(1) (viii)
Violation | Corrective action | Normal abatement period |
Major | Install, repair, or replace equipment, as necessary | Prompt correction required. |
Table 35 to § 3176.8(d)(1)(ix)
Violation | Corrective action | Normal abatement period |
Major | Install, repair, or replace equipment, as necessary | Prompt correction required. |
Table 36 to § 3176.8(d)(2)(i)
Violation | Corrective action | Normal abatement period |
Major | Adjust pH | Prompt correction required. |
Table 37 to § 3176.8(d)(2)(ii)
Violation | Corrective action | Normal abatement period |
Major | Install, repair, or replace equipment, as necessary | 24 hours. |
Table 38 to § 3176.8(d)(2)(iii)
Violation | Corrective action | Normal abatement period |
Major | Obtain proper mud additives | 24 hours. |
Table 39 to § 3176.8(d)(3)(ii)
Violation | Corrective action | Normal abatement period |
Major | Install, repair, or replace appropriate equipment, as necessary | Prompt correction required. |
Table 40 to § 3176.8(d)(4)
Violation | Corrective action | Normal abatement period |
Major | Terminate the well test | Prompt correction required. |
43 C.F.R. §3176.8