Current through November 30, 2024
Section 3175.93 - Integration statementsAn unedited integration statement must be retained and made available to the BLM upon request. The integration statement must contain the following information:
(a) The information required in § 3170.7(g) of this part;(b) The name of the company performing the integration;(c) The month and year for which the integration statement applies;(d) Meter-tube inside diameter (inches);(e) The following primary device information, as applicable:(i) Orifice bore diameter (inches); or(ii) Beta or area ratio, discharge coefficient, and other information necessary to calculate the flow rate;(f) Relative density (specific gravity);(g) CO2 content (mole percent);(h) N2 content (mole percent);(i) Heating value calculated under § 3175.125 (Btu/standard cubic feet);(j) Atmospheric pressure or elevation at the FMP;(m) Static-pressure tap location (upstream or downstream);(n) Chart rotation (hours or days);(o) Differential-pressure bellows range (inches of water);(p) Static-pressure element range (psi); and(q) For each chart or day integrated: (i) The time and date on and time and date off;(ii) Average differential pressure (inches of water);(iii) Average static pressure;(iv) Static-pressure units of measure (psia or psig);(v) Average temperature ( °F);(vi) Integrator counts or extension;