Current through May 31, 2024
Section 302-10.204 - What costs are allowed for preparing a mobile home for shipment?Allowable costs for preparing a mobile home for shipment include but are not limited to:
(a) Blocking and unblocking (including anchoring and unanchoring);(b) Labor costs of removing and installing skirting;(c) Separating, preparing, and sealing each section for movement;(d) Reassembling the two halves of a double-wide mobile home;(f) Rental, installation, removal and transportation of hitches and extra axles with wheels and tires;(g) Purchasing blocks in lieu of transporting blocks from old official station and cost of replacement blocks broken while mobile home was being transported;(h) Packing and unpacking of HHG associated with the mobile home;(i) Disconnecting and connecting utilities;(j) Installation and removal of towing lights on trailer;(k) Charges for reasonable extension of existing water and sewer lines; and(l) Dismantling and assembling a portable room appended to a mobile home.