Except as provided in 40 CFR 125.30 through 125.32 , any existing point source subject to this subpart must achieve the following effluent limitations representing the degree of reduction attainable by the application of the best practicable control technology (BPT): There shall be no discharge of process wastewater pollutants into navigable waters.
40 C.F.R. § 429.71