40 C.F.R. § 262.263

Current through May 31, 2024
Section 262.263 - Amendment of contingency plan

The contingency plan must be reviewed, and immediately amended, if necessary, whenever:

(a) Applicable regulations are revised;
(b) The plan fails in an emergency;
(c) The generator facility changes-in its design, construction, operation, maintenance, or other circumstances-in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency;
(d) The list of emergency coordinators changes; or
(e) The list of emergency equipment changes.

40 C.F.R. §262.263

81 FR 85823, 5/30/2017