40 C.F.R. § 63.1662-63 app Table 7 to Subpart YYYY of Part 63

Current through May 31, 2024
Appendix Table 7 to Subpart YYYY of Part 63 - Applicability of General Provisions to Subpart YYYY

You must comply with the applicable General Provisions requirements:

Citation Subject Applies to subpart YYYY Explanation
§ 63.1 General applicability of the General ProvisionsYesAdditional terms defined in § 63.6175 .
§ 63.2 DefinitionsYesAdditional terms defined in § 63.6175 .
§ 63.3 Units and abbreviationsYes
§ 63.4 Prohibited activitiesYes
§ 63.5 Construction and reconstructionYes
§ 63.6(a) ApplicabilityYes
§ 63.6(b)(1)-(4) Compliance dates for new and reconstructed sourcesYes
§ 63.6(b)(5) NotificationYes
§ 63.6(b)(6) [Reserved]
§ 63.6(b)(7) Compliance dates for new and reconstructed area sources that become majorYes
§ 63.6(c)(1)-(2) Compliance dates for existing sourcesYes
§ 63.6(c)(3)-(4) [Reserved]
§ 63.6(c)(5) Compliance dates for existing area sources that become majorYes
§ 63.6(d) [Reserved]
§ 63.6(e)(1)(i) General duty to minimize emissionsYes before September 8, 2020.
No after September 8, 2020. See § 63.6105 for general duty requirement.
§ 63.6(e)(1)(ii) Requirement to correct malfunctions ASAPYes before September 8, 2020.
No after September 8, 2020.
§ 63.6(e)(1)(iii) Operation and Maintenance RequirementsYes
§ 63.6(e)(2) [Reserved]
§ 63.6(e)(3) SSMPYes before September 8, 2020.
No after September 8, 2020.
§ 63.6(f)(1) Applicability of standards except during startup, shutdown, or malfunction (SSM)Yes before September 8, 2020.
No after September 8, 2020.
§ 63.6(f)(2) Methods for determining complianceYes
§ 63.6(f)(3) Finding of complianceYes
§ 63.6(g)(1)-(3) Use of alternative standardYes
§ 63.6(h) Opacity and visible emission standardsNoSubpart YYYY does not contain opacity or visible emission standards.
§ 63.6(i) Compliance extension procedures and criteriaYes
§ 63.6(j) Presidential compliance exemptionYes
§ 63.7(a)(1)-(2) Performance test datesYesSubpart YYYY contains performance test dates at § 63.6110 .
§ 63.7(a)(3) Section 114 authorityYes
§ 63.7(b)(1) Notification of performance testYes
§ 63.7(b)(2) Notification of reschedulingYes
§ 63.7(c) Quality assurance/test planYes
§ 63.7(d) Testing facilitiesYes
§ 63.7(e)(1) Conditions for conducting performance testsYes before September 8, 2020.
No after September 8, 2020.
§ 63.7(e)(2) Conduct of performance tests and reduction of dataYesSubpart YYYY specifies test methods at § 63.6120 .
§ 63.7(e)(3) Test run durationYes
§ 63.7(e)(4) Administrator may require other testing under section 114 of the CAAYes
§ 63.7(f) Alternative test method provisionsYes
§ 63.7(g) Performance test data analysis, recordkeeping, and reportingYes
§ 63.7(h) Waiver of testsYes
§ 63.8(a)(1) Applicability of monitoring requirementsYesSubpart YYYY contains specific requirements for monitoring at § 63.6125 .
§ 63.8(a)(2) Performance specificationsYes
§ 63.8(a)(3) [Reserved]
§ 63.8(a)(4) Monitoring for control devicesNo
§ 63.8(b)(1) MonitoringYes
§ 63.8(b)(2)-(3) Multiple effluents and multiple monitoring systemsYes
§ 63.8(c)(1) Monitoring system operation and maintenanceYes
§ 63.8(c)(1)(i) General duty to minimize emissions and CMS operationYes before September 8, 2020.
No after September 8, 2020.
§ 63.8(c)(1)(ii) Parts for repair of CMS readily availableYes
§ 63.8(c)(1)(iii) Requirement to develop SSM Plan for CMSYes before September 8, 2020.
No after September 8, 2020.
§ 63.8(c)(2)-(3) Monitoring system installationYes
§ 63.8(c)(4) Continuous monitoring system (CMS) requirementsYesExcept that subpart YYYY does not require continuous opacity monitoring systems (COMS).
§ 63.8(c)(5) COMS minimum proceduresNo
§ 63.8(c)(6)-(8) CMS requirementsYesExcept that subpart YYYY does not require COMS.
§ 63.8(d)(1)-(2) CMS quality controlYes
§ 63.8(d)(3) Written procedures for CMSYes before September 8, 2020.
No after September 8, 2020.
§ 63.8(e) CMS performance evaluationYesExcept for § 63.8(e)(5)(ii) , which applies to COMS.
§ 63.8(f)(1)-(5) Alternative monitoring methodYes
§ 63.8(f)(6) Alternative to relative accuracy testYes
§ 63.8(g) Data reductionYesExcept that provisions for COMS are not applicable. Averaging periods for demonstrating compliance are specified at §§ 63.6135 and 63.6140 .
§ 63.9(a) Applicability and State delegation of notification requirementsYes
§ 63.9(b)(1)-(5) Initial notificationsYesExcept that § 63.9(b)(3) is reserved.
§ 63.9(c) Request for compliance extensionYes
§ 63.9(d) Notification of special compliance requirements for new sourcesYes
§ 63.9(e) Notification of performance testYes
§ 63.9(f) Notification of visible emissions/opacity testNoSubpart YYYY does not contain opacity or VE standards.
§ 63.9(g)(1) Notification of performance evaluationYes
§ 63.9(g)(2) Notification of use of COMS dataNoSubpart YYYY does not contain opacity or VE standards.
§ 63.9(g)(3) Notification that criterion for alternative to relative accuracy test audit (RATA) is exceededYes
§ 63.9(h) Notification of compliance statusYesExcept that notifications for sources not conducting performance tests are due 30 days after completion of performance evaluations. § 63.9(h)(4) is reserved.
§ 63.9(i) Adjustment of submittal deadlinesYes
§ 63.9(j) Change in previous informationYes
§ 63.9(k) Electronic reporting proceduresYesOnly as specified in § 63.9(j) .
§ 63.10(a) Administrative provisions for recordkeeping and reportingYes
§ 63.10(b)(1) Record retentionYes
§ 63.10(b)(2)(i) Recordkeeping of occurrence and duration of startups and shutdownsYes before September 8, 2020.
No after September 8, 2020.
§ 63.10(b)(2)(ii) Recordkeeping of failures to meet a standardYes before September 8, 2020.
No after September 8, 2020. See § 63.6155 for recordkeeping of (1) date, time and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure.
§ 63.10(b)(2)(iii) Maintenance recordsYes
§ 63.10(b)(2)(iv)-(v) Records related to actions during SSMYes before September 8, 2020.
No after September 8, 2020.
§ 63.10(b)(2)(vi)-(xi) CMS recordsYes
§ 63.10(b)(2)(xii) Record when under waiverYes
§ 63.10(b)(2) (xiii)Records when using alternative to RATAYes
§ 63.10(b)(2)(xiv) Records of supporting documentationYes
§ 63.10(b)(3) Records of applicability determinationYes
§ 63.10(c)(1)-(14) Additional records for sources using CMSYesExcept that § 63.10(c)(2)-(4) and (9) are reserved.
§ 63.10(c)(15) Use of SSM PlanYes before September 8, 2020.
No after September 8, 2020.
§ 63.10(d)(1) General reporting requirementsYes
§ 63.10(d)(2) Report of performance test resultsYes
§ 63.10(d)(3) Reporting opacity or VE observationsNoSubpart YYYY does not contain opacity or VE standards.
§ 63.10(d)(4) Progress reportsYes
§ 63.10(d)(5) Startup, shutdown, and malfunction reportsNo. After September 8, 2020, see 63.6150(a) for malfunction reporting requirements.
§ 63.10(e)(1) and (2)(i) Additional CMS reportsYes
§ 63.10(e)(2)(ii) COMS-related reportNoSubpart YYYY does not require COMS.
§ 63.10(e)(3) Excess emissions and parameter exceedances reportsYesAfter September 8, 2020 submitted with the compliance report through CEDRI according to § 63.6150(a) .
§ 63.10(e)(4) Reporting COMS dataNoSubpart YYYY does not require COMS.
§ 63.10(f) Waiver for recordkeeping and reportingYes
§ 63.11 FlaresNo
§ 63.12 State authority and delegationsYes
§ 63.13 AddressesYesAfter September 8, 2020 not applicable to reports required to be submitted through CEDRI by 63.6150(c), (e), (f), or (g).
§ 63.14 Incorporation by referenceYes
§ 63.15 Availability of informationYes

40 C.F.R. 63.1662-63 app Table 7 to Subpart YYYY of Part 63

85 FR 13543, Mar. 9, 2020, as amended at 85 FR 73911, Nov. 19, 2020
85 FR 13543, 3/9/2020; 85 FR 73911, 1/19/2021