40 C.F.R. § 63.1662-63 app Table 8 to Subpart UUUU of Part 63

Current through May 31, 2024
Appendix Table 8 to Subpart UUUU of Part 63 - Reporting Requirements

As required in § 63.5580 , you must submit the appropriate reports specified in the following table:

You must submit a compliance report, which must contain the following information . . .and you must submit the report . . .
1. if there are no deviations from any emission limit, operating limit, or work practice standard during the reporting period, then the report must contain the information specified in § 63.5580(c) ;semiannually as specified in § 63.5580(b) ; beginning on December 29, 2020, submit all subsequent reports following the procedure specified in § 63.5580(g) .
2. if there were no periods during which the CMS was out-of-control, then the report must contain the information specified in § 63.5580(c)(6) ;
3. if there is a deviation from any emission limit, operating limit, or work practice standard during the reporting period, then the report must contain the information specified in § 63.5580(c) and (d) ;
4. if there were periods during which the CMS was out-of-control, then the report must contain the information specified in § 63.5580(e) ;
5. for sources which commenced construction or reconstruction on or before September 9, 2019, if prior to December 29, 2020, you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your SSM plan, then the report must contain the information specified in § 63.10(d)(5)(i) ;
6. for sources which commenced construction or reconstruction on or before September 9, 2019, if prior to December 29, 2020, you had a startup, shutdown, or malfunction during the reporting period and you took actions that are not consistent with your SSM plan, then the report must contain the information specified in § 63.10(d)(5)(ii) ;
7. the report must contain any changes in information already provided, as specified in § 63.9(j) , except changes in major source status must be reported per § 63.9(j) ;
8. for cellulose ether affected sources complying with the equipment leak requirements of subpart H of this part, the report must contain the information specified in § 63.182(a)(3) and (6) and (d)(2) through (4) ;
9. for cellulose ether affected sources complying with the equipment leak requirements of subpart UU of this part, the report must contain the information specified in § 63.1039(b) ;
10. for cellulose ether affected sources complying with the wastewater requirements of subparts F and G of this part, the report must contain the information specified in §§ 63.146(c) through (e) and 63.152(a)(4) and (5) and (c) through (e) ;
11. for affected sources complying with the closed-vent system provisions in § 63.148 , the report must contain the information specified in § 63.148(j)(1) ;
12. for affected sources complying with the bypass line provisions in § 63.148(f) , the report must contain the information specified in § 63.148(j)(2) and (3) ;
13. for affected sources invoking the delay of repair provisions in § 63.104(e) for heat exchanger systems, the next compliance report must contain the information in § 63.104(f)(2)(i) through (iv) ; if the leak remains unrepaired, the information must also be submitted in each subsequent compliance report until the repair of the leak is reported; and
14. for storage vessels subject to the emission limits and work practice standards in Table 1 to Subpart UUUU, the report must contain the periods of planned routine maintenance during which the control device does not comply with the emission limits or work practice standards in Table 1 to this subpart.

40 C.F.R. 63.1662-63 app Table 8 to Subpart UUUU of Part 63

85 FR 40016, July 2, 2020, as amended at 85 FR 73909, Nov. 19, 2020
85 FR 40016, 7/2/2020; 85 FR 73909, 1/19/2021