40 C.F.R. § 63 app Table 1 to Subpart U of Part 63

Current through May 31, 2024
Appendix Table 1 to Subpart U of Part 63 - [Effective until 7/15/2024] Applicability of General Provisions to Subpart U Affected Sources

Reference Applies to subpart U Explanation
§ 63.1(a)(1) Yes§ 63.482 specifies definitions in addition to or that supersede definitions in § 63.2 .
§ 63.1(a)(2) Yes.
§ 63.1(a)(3) Yes§ 63.481(f) through (k) and § 63.160(b) identify those standards which may apply in addition to the requirements of subparts U and H of this part, and specify how compliance shall be achieved.
§ 63.1(a)(4) YesSubpart U (this table) specifies the applicability of each paragraph in subpart A to subpart U.
§ 63.1(a)(5) No[Reserved].
§ 63.1(a)(6)-(8) Yes.
§ 63.1(a)(9) No[Reserved].
§ 63.1(a)(10) Yes.
§ 63.1(a)(11) Yes.
§ 63.1(a)(12)-(14) Yes.
§ 63.1(b)(1) No§ 63.480(a) contains specific applicability criteria.
§ 63.1(b)(2) Yes.
§ 63.1(b)(3) No§ 63.480(b) provides documentation requirements for EPPUs not considered affected sources.
§ 63.1(c)(1) YesSubpart U (this table) specifies the applicability of each paragraph in subpart A to subpart U.
§ 63.1(c)(2) NoArea sources are not subject to subpart U.
§ 63.1(c)(3) No[Reserved].
§ 63.1(c)(4) Yes.
§ 63.1(c)(5) YesExcept that affected sources are not required to submit notifications that are not required by subpart U.
§ 63.1(c)(6) Yes
§ 63.1(d) No[Reserved].
§ 63.1(e) Yes.
§ 63.2 Yes§ 63.482 specifies those subpart A definitions that apply to subpart U.
§ 63.3 Yes.
§ 63.4(a)(1)-(3) Yes.
§ 63.4(a)(4) No[Reserved].
§ 63.4(a)(5) Yes.
§ 63.4(b) Yes.
§ 63.4(c) Yes.
§ 63.5(a)(1) YesExcept the terms "source" and "stationary source" should be interpreted as having the same meaning as "affected source".
§ 63.5(a)(2) Yes.
§ 63.5(b)(1) YesExcept § 63.480(i) defines when construction or reconstruction is subject to new source standards.
§ 63.5(b)(2) No[Reserved].
§ 63.5(b)(3) Yes.
§ 63.5(b)(4) YesExcept that the Initial Notification and § 63.9(b) requirements do not apply.
§ 63.5(b)(5) Yes.
§ 63.5(b)(6) YesExcept that § 63.480(i) defines when construction or reconstruction is subject to the new source standards.
§ 63.5(c) No[Reserved].
§ 63.5(d)(1)(i) YesExcept that the references to the Initial Notification and § 63.9(b)(5) do not apply.
§ 63.5(d)(1)(ii) YesExcept that § 63.5(d)(1)(ii)(H) does not apply.
§ 63.5(d)(1)(iii) No§ 63.506(e)(5) and § 63.502(f) specify Notification of Compliance Status requirements.
§ 63.5(d)(2) No.
§ 63.5(d)(3) YesExcept § 63.5(d)(3)(ii) does not apply, and equipment leaks subject to § 63.502 are exempt.
§ 63.5(d)(4) Yes.
§ 63.5(e) Yes.
§ 63.5(f)(1) Yes.
§ 63.5(f)(2) YesExcept that where § 63.9(b)(2) is referred to, the owner or operator need not comply.
§ 63.6(a) Yes.
§ 63.6(b)(1) NoThe dates specified in § 63.481(b) apply, instead.
§ 63.6(b)(2) No.
§ 63.6(b)(3) No.
§ 63.6(b)(4) No.
§ 63.6(b)(5) No.
§ 63.6(b)(6) No[Reserved].
§ 63.6(b)(7) No.
§ 63.6(c)(1) Yes§ 63.481 specifies the compliance date.
§ 63.6(c)(2) No.
§ 63.6(c)(3) No[Reserved].
§ 63.6(c)(4) No[Reserved].
§ 63.6(c)(5) Yes.
§ 63.6(d) No[Reserved].
§ 63.6(e)(1)(i) NoSee § 63.483(a)(1) for general duty requirement. Any cross reference to § 63.6(e)(1)(i) in any other general provision incorporated by reference shall be treated as a cross reference to § 63.483(a)(1) .
§ 63.6(e)(1)(ii) No
§ 63.6(e)(1)(iii) Yes.
§ 63.6(e)(2) No[Reserved]
§ 63.6(e)(3) No
§ 63.6(f)(1) No
§ 63.6(f)(2) YesExcept 63.7(c), as referred to in § 63.6(f)(2)(iii)(D) does not apply, and except that § 63.6(f)(2)(ii) does not apply to equipment leaks subject to § 63.502 .
§ 63.6(f)(3) Yes.
§ 63.6(g) Yes.
§ 63.6(h) NoSubpart U does not require opacity and visible emission standards.
§ 63.6(i)(1) Yes.
§ 63.6(i)(2) Yes.
§ 63.6(i)(3) Yes.
§ 63.6(i)(4)(i)(A) Yes.
§ 63.6(i)(4)(i)(B) NoDates are specified in § 63.481(e) and § 63.506(e)(3)(i) .
§ 63.6(i)(4)(ii) No.
§ 63.6(i)(5)-(14) Yes.
§ 63.6(i)(15) No[Reserved].
§ 63.6(i)(16) Yes.
§ 63.6(j) Yes.
§ 63.7(a)(1) Yes.
§ 63.7(a)(2) No.§ 63.506(e)(5) specifies the submittal dates of performance test results for all emission points except equipment leaks; for equipment leaks, compliance demonstration results are reported in the Periodic Reports.
§ 63.7(a)(3) Yes.
§ 63.7(b) No§ 63.504(a)(4) specifies notification requirements.
§ 63.7(c) NoExcept if the owner or operator chooses to submit an alternative nonopacity emission standard for approval under § 63.6(g) .
§ 63.7(d) Yes.
§ 63.7(e)(1) NoSee § 63.504(a)(1) . Any cross-reference to § 63.7(e)(1) in any other general provision incorporated by reference shall be treated as a cross-reference to § 63.504(a)(1) .
§ 63.7(e)(2) Yes.
§ 63.7(e)(3) NoSubpart U specifies requirements.
§ 63.7(e)(4) Yes.
§ 63.7(f) YesExcept that § 63.144(b)(5)(iii)(A) & (B) shall apply for process wastewater. Also, since a site specific test plan is not required, the notification deadline in § 63.7(f)(2)(i) shall be 60 days prior to the performance test, and in § 63.7(f)(3) approval or disapproval of the alternative test method shall not be tied to the site specific test plan.
§ 63.7(g) YesExcept that the requirements in § 63.506(e)(5) shall apply instead of references to the Notification of Compliance Status report in 63.9(h). In addition, equipment leaks subject to § 63.502 are not required to conduct performance tests.
§ 63.7(h) YesExcept § 63.7(h)(4)(ii) is not applicable, since the site-specific test plans in § 63.7(c)(2) are not required.
§ 63.8(a)(1) Yes.
§ 63.8(a)(2) No.
§ 63.8(a)(3) No[Reserved].
§ 63.8(a)(4) Yes.
§ 63.8(b)(1) Yes.
§ 63.8(b)(2) NoSubpart U specifies locations to conduct monitoring.
§ 63.8(b)(3) Yes.
§ 63.8(c)(1) Yes.
§ 63.8(c)(1)(i) Yes.
§ 63.8(c)(1)(ii) NoFor all emission points except equipment leaks, comply with § 63.506(b)(1)(i)(B) ; for equipment leaks, comply with § 63.181(g)(2)(iii) .
§ 63.8(c)(1)(iii) Yes.
§ 63.8(c)(2) Yes.
§ 63.8(c)(3) Yes.
§ 63.8(c)(4) No§ 63.505 specifies monitoring frequency; not applicable to equipment leaks, because § 63.502 does not require continuous monitoring systems.
§ 63.8(c)(5)-(8) No.
§ 63.8(d) No.
§ 63.8(e) No.
§ 63.8(f)(1)-(3) Yes.
§ 63.8(f)(4)(i) NoTimeframe for submitting request is specified in § 63.506(f) or (g) ; not applicable to equipment leaks, because § 63.502 (through reference to subpart H) specifies acceptable alternative methods.
§ 63.8(f)(4)(ii) NoContents of request are specified in § 63.506(f) or (g) .
§ 63.8(f)(4)(iii) No.
§ 63.8(f)(5)(i) Yes.
§ 63.8(f)(5)(ii) No.
§ 63.8(f)(5)(iii) Yes.
§ 63.8(f)(6) NoSubpart U does not require CEM's.
§ 63.8(g) NoData reduction procedures specified in § 63.506(d) and (h) ; not applicable to equipment leaks.
§ 63.9(a) Yes.
§ 63.9(b) NoSubpart U does not require an initial notification.
§ 63.9(c) Yes.
§ 63.9(d) Yes.
§ 63.9(e) No§ 63.504(a)(4) specifies notification deadline.
§ 63.9(f) NoSubpart U does not require opacity and visible emission standards.
§ 63.9(g) No.
§ 63.9(h) No§ 63.506(e)(5) specifies Notification of Compliance Status requirements.
§ 63.9(i) Yes.
§ 63.9(j) YesFor change in major source status only.
§ 63.9(k) YesOnly as specified in § 63.9(j) .
§ 63.10(a) Yes
§ 63.10(b)(1) No§ 63.506(a) specifies record retention requirements.
§ 63.10(b)(2) NoSubpart U specifies recordkeeping requirements.
§ 63.10(b)(3) No§ 63.480(b) requires documentation of sources that are not affected sources.
§ 63.10(c) No§ 63.506 specifies recordkeeping requirements.
§ 63.10(d)(1) Yes
§ 63.10(d)(2) No§ 63.506(e)(5) specifies performance test reporting requirements; not applicable to equipment leaks.
§ 63.10(d)(3) NoSubpart U does not require opacity and visible emission standards.
§ 63.10(d)(4) Yes
63.10(d)(5)(i)No
§ 63.10(d)(5)(ii) No
§ 63.10(e) No§ 63.506 specifies reporting requirements.
§ 63.10(f) Yes
§ 63.11 Yes§ 63.11(b) specifies requirements for flares used to comply with provisions of this subpart. § 63.504(c) contains the requirements to conduct compliance demonstrations for flares subject to this subpart. § 63.11(c), (d), and (e) specifies requirements for an alternative work practice for equipment leaks.
§ 63.12 YesExcept that the authority of § 63.503(i) and the authority of § 63.177 (for equipment leaks) will not be delegated to States.
§§ 63.13-63 .15Yes

a The plan and any records or reports of start-up, shutdown, and malfunction do not apply to Group 2 emission points unless they are included in an emissions average.

40 C.F.R. 63 app Table 1 to Subpart U of Part 63

66 FR 36928, July 16, 2001, as amended at 71 FR 20457, Apr. 20, 2006; 73 FR 78213, Dec. 22, 2008; 85 FR 73891, Nov. 19, 2020
85 FR 73891, 1/19/2021