40 C.F.R. § 63 app A to Subpart RRR of Part 63

Current through May 31, 2024
Appendix A to Subpart RRR of Part 63 - General Provisions Applicability to Subpart RRR

Citation Requirement Applies to RRR Comment
§ 63.1(a)(1)-(4) General ApplicabilityYes
§ 63.1(a)(5) No[Reserved]
§ 63.1(a)(6) Yes
§ 63.1(a)(7)-(9) No[Reserved]
§ 63.1(a)(10)-(12) Yes
§ 63.1(b) Initial Applicability DeterminationYesEPA retains approval authority.
§ 63.1(c)(1) Applicability After Standard EstablishedYes
§ 63.1(c)(2) Yes§ 63.1500(e) exempts area sources subject to this subpart from the obligation to obtain Title V operating permits.
§ 63.1(c)(3)-(4) No[Reserved]
§ 63.1(c)(5) Yes
§ 63.1(c)(6) ReclassificationYes
§ 63.1(d) No[Reserved]
§ 63.1(e) Applicability of Permit ProgramYes
§ 63.2 DefinitionsYesAdditional definitions in § 63.1503 .
§ 63.3 Units and AbbreviationsYes
§ 63.4(a)(1)-(2) Prohibited ActivitiesYes
§ 63.4(a)(3)-(5) No[Reserved]
§ 63.4(b) CircumventionYes
§ 63.4(c) FragmentationYes
§ 63.5(a) Applicability of Preconstruction Review and NotificationYes
§ 63.5(b)(1) Requirements for Existing, Newly, Constructed Sources and Reconstructed SourcesYes
§ 63.5(b)(2) No[Reserved]
§ 63.5(b)(3)-(4) Yes
§ 63.5(b)(5) No[Reserved]
§ 63.5(b)(6) Yes
§ 63.5(c) No[Reserved]
§ 63.5(d) Application for Approval of Construction or ReconstructionYes
§ 63.5(e) Approval of Construction or ReconstructionYes
§ 63.5(f) Approval of Construction or Reconstruction Based on Prior State Preconstruction ReviewYes
§ 63.6(a) Applicability for Compliance with Standards and Maintenance RequirementsYes
§ 63.6(b)(1)-(5) Compliance Dates for New and Reconstructed SourcesYes§ 63.1501 specifies dates.
§ 63.6(b)(6) No[Reserved]
§ 63.6(b)(7) Yes
§ 63.6(c)(1) Compliance Dates for Existing SourcesYes§ 63.1501 specifies dates.
§ 63.6(c)(2) Yes
§ 63.6(c)(3)-(4) No[Reserved]
§ 63.6(c)(5) Yes
§ 63.6(d) No[Reserved]
§ 63.6(e)(1)(i) Operation and Maintenance RequirementsNoSee § 63.1506(a)(5) for general duty requirement. Any other cross reference to § 63.6(3)(1)(i) in any other general provision referenced shall be treated as a cross reference to § 63.1506(a)(5) .
§ 63.6(e)(1)(ii) No
§ 63.6(e)(2) No[Reserved]
§ 63.6(e)(3) Startup, Shutdown, and Malfunction PlanNo
§ 63.6(f)(1) Compliance with Nonopacity Emission StandardsNo
§ 63.6(f)(2) Yes
§ 63.6(g) Use of an Alternative Nonopacity Emission StandardNo
§ 63.6(h)(1) Applicability for Compliance with Opacity and Visible Emission StandardsNo
§ 63.6(h)(2) Methods for Determining ComplianceYes
§ 63.6(h)(3) No[Reserved]
§ 63.6(h)(4)-(9) Yes
§ 63.6(i)(1)-(14) Extension of ComplianceYes
§ 63.6(i)(15) No[Reserved]
§ 63.6(i)(16) Yes
§ 63.6(j) Exemption from ComplianceYes
§ 63.7(a) Applicability and Performance Test DatesYesExcept § 63.1511 establishes dates for initial performance tests.
§ 63.7(b) Notification of Performance TestYes
§ 63.7(c) Quality Assurance ProgramYes
§ 63.7(d) Performance Testing FacilitiesYes
§ 63.7(e)(1) Conduct of Performance TestsNo
§ 63.7(e)(2) Yes
§ 63.7(e)(3) Yes
§ 63.7(f) Use of an Alternative Test MethodYes
§ 63.7(g)(1)-(3) Data Analysis, Recordkeeping, and ReportingYesExcept for § 63.7(g)(2) , which is reserved.
§ 63.7(h)(1)-(5) Waiver of Performance TestsYes
§ 63.8(a)(1) Applicability for Monitoring RequirementsYes
§ 63.8(a)(2) Yes
§ 63.8(a)(3) No[Reserved]
§ 63.8(a)(4) Yes
§ 63.8(b) Conduct of MonitoringYes
§ 63.8(c)(1)(i) Operation and Maintenance of Continuous Monitoring Systems (CMS)NoSee § 63.1506(a)(5) for general duty requirement.
§ 63.8(c)(1)(ii) Yes
§ 63.8(c)(1)(iii) No
§ 63.8(c)(2)-(8) Yes
§ 63.8(d)(1)-(2) Quality Control ProgramYes
§ 63.8(d)(3) Yes, except for last sentence, which refers to an SSM plan. SSM plans are not required
§ 63.8(e) Performance Evaluation of CMSYes
§ 63.8(f)(1)-(5) Use of an Alternative Monitoring MethodNo§ 63.1501(w) includes provisions for monitoring alternatives.
§ 63.8(f)(6) Alternative to the Relative Accuracy TestYes
§ 63.8(g)(1) Reduction of Monitoring DataYes
§ 63.8(g)(2) No§ 63.1512 requires five 6-minute averages for an aluminum scrap shredder.
§ 63.8(g)(3)-(5) Yes
§ 63.9(a) Applicability and General Information for Notification RequirementsYes
§ 63.9(b)(1)-(5) Initial NotificationsYesExcept § 63.9(b)(3) is reserved.
§ 63.9(c) Request for Compliance ExtensionYes
§ 63.9(d) Notification that Source is Subject to Special Compliance RequirementsYes
§ 63.9(e) Notification of Performance TestYes
§ 63.9(f) Notification of Opacity and Visible Emission ObservationsYes
§ 63.9(g) Additional Notification Requirement for Sources with CMSYes
§ 63.9(h)(1)-(3) Notification of Compliance StatusYesExcept § 63.1515 establishes dates notification of compliance status reports.
§ 63.9(h)(4) No[Reserved]
§ 63.9(h)(5)-(6) Yes
§ 63.9(i) Adjustment of Deadlines for Required CommunicationsYes
§ 63.9(j) Change in Information Already ProvidedYes
§ 63.9(k) Electronic reporting proceduresYesOnly as specified in § 63.9(j) .
§ 63.10(a) Applicability and General Information for Recordkeeping and Reporting RequirementsYes
§ 63.10(b)(1) General Recordkeeping RequirementsYes
§ 63.10(b)(2)(i), (ii), (iv), (v) No
§ 63.10(b)(2)(iii), (vi)-(xiv) Yes§ 63.1517 includes additional requirements.
§ 63.10(b)(3) Recordkeeping Requirement for Applicability DeterminationsYes
§ 63.10(c)(1) Additional Recordkeeping Requirements for Sources with CMSYes
§ 63.10(c)(2)-(4) No[Reserved]
§ 63.10(c)(5) Yes
§ 63.10(c)(6) Yes
§ 63.10(c)(7)-(8) Yes
§ 63.10(c)(9) No[Reserved]
§ 63.10(c)(10)-(13) Yes
§ 63.10(c)(14) Yes
§ 63.10(c)(15) No
§ 63.10(d)(1) General Reporting RequirementsYes
§ 63.10(d)(2) Reporting Results of Performance TestsYes
§ 63.10(d)(3) Reporting Results of Opacity or Visible Emission ObservationsYes
§ 63.10(d)(4) Progress ReportsNoSee § 63.1516(d) .
§ 63.10(d)(5) Periodic Startup, Shutdown, and Malfunction ReportsNoSee § 63.1516(d) .
§ 63.10(e)(1)-(2) Additional Reporting Requirements for Sources with CMSYes
§ 63.10(e)(3) Excess Emissions and CMS Performance Report and Summary ReportYesReporting deadline given in § 63.1516 .
§ 63.10(e)(4) Continuous Opacity Monitoring System (COMS) Data Produced During a Performance TestYes
§ 63.10(f) Waiver of Recordkeeping or Reporting RequirementsYes
§ 63.11(a)-(e) Control Device and Work Practice RequirementsNoFlares not applicable.
§ 63.12(a)-(c) State Authority and DelegationsYesEPA retains authority for applicability determinations.
§ 63.13 AddressesYes
§ 63.14 Incorporations by ReferenceYesACGIH Guidelines, ASTM D7520-13, and Interim Procedures for Estimating Risks Associated with Exposures to Mixtures of Chlorinated Dibenzo-p-Dioxins and -Dibenzofurans (CDDs and CDFs) and 1989 Update.
§ 63.15 Availability of Information and ConfidentialityYes
§ 63.16 Performance Track ProvisionsNo

40 C.F.R. 63 app A to Subpart RRR of Part 63

81 FR 38093, June 13, 2016, as amended at 85 FR 73901, Nov. 19, 2020
81 FR 38093, 9/12/2016; 85 FR 73901, 1/19/2021