If your source is a: | And you commenced construction: | Your emission limits are:1 | And you must comply by:2 |
1. Glass-melting furnace | On or before March 31, 1997 | 0.5 lb PM per ton of glass pulled3 | June 14, 2002. |
2. Glass-melting furnace | After March 31, 1997 but on or before November 25, 2011 | 0.5 lb PM per ton of glass pulled3 | June 14, 1999. |
3. Glass-melting furnace | On or before November 25, 2011 | 0.33 lb PM per ton of glass pulled | July 31, 2017. |
4. Glass-melting furnace | After November 25, 2011 | 0.33 lb PM per ton of glass pulled | July 29, 2015.4 |
5. Gas-fired glass-melting furnace | On or before November 25, 2011 | 0.00025 lb chromium compounds per ton of glass pulled | July 31, 2017. |
6. Gas-fired glass-melting furnace | After November 25, 2011 | 0.00025 lb chromium compounds per ton of glass pulled | July 29, 2015.4 |
7. Rotary spin manufacturing line | On or before March 31, 1997 | 1.2 lb formaldehyde per ton of glass pulled5 | June 14, 2002. |
8. Rotary spin manufacturing line | After March 31, 1997 | 0.8 lb formaldehyde per ton of glass pulled5 | June 14, 1999. |
9. Rotary spin manufacturing line | On or before November 25, 2011 | 1.2 lb formaldehyde per ton of glass pulled 1.1 lb methanol per ton of glass pulled | December 26, 2020. |
10. Rotary spin manufacturing line | After November 25, 2011 | 0.8 lb formaldehyde per ton of glass pulled 0.65 lb methanol per ton of glass pulled | December 26, 2017.4 |
11. Flame-attenuation line manufacturing a heavy-density product | After March 31, 1997, but on or before November 25, 2011 | 7.8 lb formaldehyde per ton of glass pulled5 | June 14, 1999. |
12. Flame-attenuation line manufacturing a pipe product | On or before March 31, 1997 | 6.8 lb formaldehyde per ton of glass pulled5 | June 14, 2002. |
13. Flame-attenuation line manufacturing a pipe product | After March 31, 1997, but before November 25, 2011 | 6.8 lb formaldehyde per ton of glass pulled5 | June 14, 1999. |
14. Flame-attenuation line manufacturing an aerospace, air filtration, or pipe product | On or before November 25, 2011 | 27 lb formaldehyde per ton of glass pulled 8.9 lb methanol per ton of glass pulled | December 26, 2020. |
15. Flame-attenuation line manufacturing an aerospace, air filtration, or pipe product | After November 25, 2011 | 18.0 lb formaldehyde per ton of glass pulled 4.0 lb methanol per ton of glass pulled | December 26, 2017.4 |
16. Flame-attenuation line manufacturing an HVAC product | On or before November 25, 2011 | 2.8 lb formaldehyde per ton of glass pulled 7.3 lb methanol per ton of glass pulled 0.4 lb phenol per ton of glass pulled | December 26, 2020. |
17. Flame-attenuation line manufacturing an HVAC product | After November 25, 2011 | 2.4 lb formaldehyde per ton of glass pulled 1.5 lb methanol per ton of glass pulled 0.4 lb phenol per ton of glass pulled | December 26, 2017.4 |
18. Flame-attenuation line manufacturing an OEM product | On or before November 25, 2011 | 5.0 lb formaldehyde per ton of glass pulled 5.7 lb methanol per ton of glass pulled 31 lb phenol per ton of glass pulled | December 26, 2020. |
19. Flame-attenuation line manufacturing an OEM product | After November 25, 2011 | 2.9 lb formaldehyde per ton of glass pulled 1.1 lb methanol per ton of glass pulled 22 lb phenol per ton of glass pulled | December 26, 2017.4 |
1 The numeric limits do not apply during startup and shutdown.
2 Existing sources must demonstrate compliance by the compliance dates specified in this table. New sources have 180 days after the applicable compliance date to demonstrate compliance.
3 This limit does not apply after July 31, 2017.
4 Or initial startup, whichever is later.
5 This limit does not apply after December 26, 2020.
40 C.F.R. 63.1390-63 app Table 2 to Subpart NNN of Part 63