40 C.F.R. § 63.1662-63 app Table 1 to Subpart HHHHHH of Part 63

Current through May 31, 2024
Appendix Table 1 to Subpart HHHHHH of Part 63 - Applicability of General Provisions to Subpart HHHHHH of Part 63

Table 1 to Subpart HHHHHH of Part 63-Applicability of General Provisions

to Subpart HHHHHH of Part 63

Citation Subject Applicable to subpart HHHHHH Explanation
§ 63.1(a)(1)-(12) General ApplicabilityYes
§ 63.1(b)(1)-(3) Initial Applicability DeterminationYesApplicability of subpart HHHHHH is also specified in § 63.11170 .
§ 63.1(c)(1) Applicability After Standard EstablishedYes
§ 63.1(c)(2) Applicability of Permit Program for Area SourcesYes§ 63.11174(b) of subpart HHHHHH exempts area sources from the obligation to obtain Title V operating permits.
§ 63.1(c)(5) NotificationsYes
§ 63.1(e) Applicability of Permit Program to Major Sources Before Relevant Standard is SetNo§ 63.11174(b) of subpart HHHHHH exempts area sources from the obligation to obtain Title V operating permits.
§ 63.2 DefinitionsYesAdditional definitions are specified in § 63.11180 .
§ 63.3(a)-(c) Units and AbbreviationsYes
§ 63.4(a)(1)-(5) Prohibited ActivitiesYes
§ 63.4(b)-(c) Circumvention/FragmentationYes
§ 63.5 Construction/Reconstruction of major sourcesNoSubpart HHHHHH applies only to area sources.
§ 63.6(a) Compliance With Standards and Maintenance Requirements-ApplicabilityYes
§ 63.6(b)(1)-(7) Compliance Dates for New and Reconstructed SourcesYes§ 63.11172 specifies the compliance dates.
§ 63.6(c)(1)-(5) Compliance Dates for Existing SourcesYes§ 63.11172 specifies the compliance dates.
§ 63.6(e)(1)-(2) Operation and Maintenance RequirementsNoSee § 63.11173(h) for general duty requirement.
§ 63.6(e)(3) Startup, Shutdown, and Malfunction PlanNoNo startup, shutdown, and malfunction plan is required by subpart HHHHHH.
§ 63.6(f)(1) Compliance with Nonopacity Emission Standards-ApplicabilityNo.
§ 63.6(f)(2)-(3) Methods for Determining ComplianceYes
§ 63.6(g)(1)-(3) Use of an Alternative StandardYes
§ 63.6(h) Compliance With Opacity/Visible Emission StandardsNoSubpart HHHHHH does not establish opacity or visible emission standards.
§ 63.6(i)(1)-(16) Extension of ComplianceYes
§ 63.6(j) Presidential Compliance ExemptionYes
§ 63.7 Performance Testing RequirementsNoNo performance testing is required by subpart HHHHHH.
§ 63.8 Monitoring RequirementsNoSubpart HHHHHH does not require the use of continuous monitoring systems.
§ 63.9(a)-(d) Notification RequirementsYes§ 63.11175 specifies notification requirements.
§ 63.9(e) Notification of Performance TestNoSubpart HHHHHH does not require performance tests.
§ 63.9(f) Notification of Visible Emissions/Opacity TestNoSubpart HHHHHH does not have opacity or visible emission standards.
§ 63.9(g) Additional Notifications When Using CMSNoSubpart HHHHHH does not require the use of continuous monitoring systems.
§ 63.9(h) Notification of Compliance StatusNo§ 63.11175 specifies the dates and required content for submitting the notification of compliance status.
§ 63.9(i) Adjustment of Submittal DeadlinesYes
§ 63.9(j) Change in Previous InformationYes§ 63.11176(a) specifies the dates for submitting the notification of changes report.
§ 63.9(k) Electronic reporting proceduresYesOnly as specified in § 63.9(j) .
§ 63.10(a) Recordkeeping/Reporting-Applicability and General InformationYes
§ 63.10(b)(1) General Recordkeeping RequirementsYesAdditional requirements are specified in § 63.11177 .
§ 63.10(b)(2)(i)-(xi) Recordkeeping Relevant to Startup, Shutdown, and Malfunction Periods and CMSNoSubpart HHHHHH does not require startup, shutdown, and malfunction plans, or CMS.
§ 63.10(b)(2)(xii) Waiver of recordkeeping requirementsYes
§ 63.10(b)(2) (xiii)Alternatives to the relative accuracy testNoSubpart HHHHHH does not require the use of CEMS.
§ 63.10(b)(2)(xiv) Records supporting notificationsYes
§ 63.10(b)(3) Recordkeeping Requirements for Applicability DeterminationsYes
§ 63.10(c) Additional Recordkeeping Requirements for Sources with CMSNoSubpart HHHHHH does not require the use of CMS.
§ 63.10(d)(1) General Reporting RequirementsYesAdditional requirements are specified in § 63.11176 .
§ 63.10(d)(2)-(3) Report of Performance Test Results, and Opacity or Visible Emissions ObservationsNoSubpart HHHHHH does not require performance tests, or opacity or visible emissions observations.
§ 63.10(d)(4) Progress Reports for Sources With Compliance ExtensionsYes
§ 63.10(d)(5) Startup, Shutdown, and Malfunction ReportsNoSubpart HHHHHH does not require startup, shutdown, and malfunction reports.
§ 63.10(e) Additional Reporting requirements for Sources with CMSNoSubpart HHHHHH does not require the use of CMS.
§ 63.10(f) Recordkeeping/Reporting WaiverYes
§ 63.11 Control Device Requirements/FlaresNoSubpart HHHHHH does not require the use of flares.
§ 63.12 State Authority and DelegationsYes
§ 63.13 Addresses of State Air Pollution Control Agencies and EPA Regional OfficesYes
§ 63.14 Incorporation by ReferenceYesTest methods for measuring paint booth filter efficiency and spray gun transfer efficiency in § 63.11173(e)(2) and (3) are incorporated and included in § 63.14 .
§ 63.15 Availability of Information/ConfidentialityYes
§ 63.16(a) Performance Track Provisions-reduced reportingYes
§ 63.16(b)-(c) Performance Track Provisions-reduced reportingNoSubpart HHHHHH does not establish numerical emission limits.

40 C.F.R. 63.1662-63 app Table 1 to Subpart HHHHHH of Part 63

87 CFR 67806 , Nov. 10, 2022
85 FR 73920, 1/19/2021; 87 CFR 67806, 11/10/2022