40 C.F.R. § Table 12 to Subpart FFFF of Part 63

Current through May 31, 2024
Appendix Table 12 to Subpart FFFF of Part 63 - Applicability of General Provisions to Subpart FFFF

As specified in § 63.2540 , the parts of the General Provisions that apply to you are shown in the following table:

CitationSubjectExplanation
§ 63.1 ApplicabilityYes.
§ 63.2 DefinitionsYes.
§ 63.3 Units and AbbreviationsYes.
§ 63.4 Prohibited ActivitiesYes.
§ 63.5 Construction/ReconstructionYes.
§ 63.6(a) ApplicabilityYes.
§ 63.6(b)(1)-(4) Compliance Dates for New and Reconstructed sourcesYes.
§ 63.6(b)(5) NotificationYes.
§ 63.6(b)(6) [Reserved]
§ 63.6(b)(7) Compliance Dates for New and Reconstructed Area Sources That Become MajorYes.
§ 63.6(c)(1)-(2) Compliance Dates for Existing SourcesYes.
§ 63.6(c)(3)-(4) [Reserved]
§ 63.6(c)(5) Compliance Dates for Existing Area Sources That Become MajorYes.
§ 63.6(d) [Reserved]
§ 63.6(e)(1)(i) Operation & MaintenanceYes, before August 12, 2023.
No, beginning on and after August 12, 2023. See § 63.2450(u) for general duty requirement.
§ 63.6(e)(1)(ii) Operation & MaintenanceYes, before August 12, 2023.
No, beginning on and after August 12, 2023.
§ 63.6(e)(1)(iii) Operation & MaintenanceYes.
§ 63.6(e)(2) [Reserved]
§ 63.6(e)(3)(i), (iii), and (v) through (viii)Startup, Shutdown, Malfunction Plan (SSMP)Yes, before August 12, 2023, except information regarding Group 2 emission points and equipment leaks is not required in the SSMP, as specified in § 63.2525(j) . No, beginning on and after August 12, 2023.
§ 63.6(e)(3)(iii) and (iv) Recordkeeping and Reporting During SSMNo, see § 63.2525 for recordkeeping requirements and § 63.2520(e)(4) for reporting requirements.
§ 63.6(e)(3)(ix) SSMP incorporation into title V permitYes, before August 12, 2023. No beginning on and after August 12, 2023.
§ 63.6(f)(1) Compliance With Non-Opacity Standards Except During SSMNo. See § 63.2445(g) through (i) .
§ 63.6(f)(2)-(3) Methods for Determining ComplianceYes.
§ 63.6(g)(1)-(3) Alternative StandardYes.
§ 63.6(h)(1) Compliance with Opacity Standards Except During SSMNo. See § 63.2445(g) through (i) .
§ 63.6(h)(2)-(9) Opacity/Visible Emission (VE) StandardsOnly for flares for which Method 22 of 40 CFR part 60, appendix A-7, observations are required as part of a flare compliance assessment.
§ 63.6(i)(1)-(14), and (16) Compliance ExtensionYes.
§ 63.6(j) Presidential Compliance ExemptionYes.
§ 63.7(a)(1)-(2) Performance Test DatesYes, except substitute 150 days for 180 days.
§ 63.7(a)(3) Section 114 AuthorityYes, and this paragraph also applies to flare compliance assessments as specified under § 63.997(b)(2) .
§ 63.7(a)(4) Force MajeureYes.
§ 63.7(b)(1) Notification of Performance TestYes.
§ 63.7(b)(2) Notification of ReschedulingYes.
§ 63.7(c) Quality Assurance/Test PlanYes, except the test plan must be submitted with the notification of the performance test if the control device controls batch process vents.
§ 63.7(d) Testing FacilitiesYes.
§ 63.7(e)(1) Conditions for Conducting Performance TestsYes, before August 12, 2023 except that performance tests for batch process vents must be conducted under worst-case conditions as specified in § 63.2460 . No, beginning on and after August 12, 2023. See § 63.2450(g)(6) .
§ 63.7(e)(2) Conditions for Conducting Performance TestsYes.
§ 63.7(e)(3) Test Run DurationYes.
§ 63.7(e)(4) Administrator's Authority to Require TestingYes.
§ 63.7(f) Alternative Test MethodYes.
§ 63.7(g) Performance Test Data AnalysisYes, except this subpart specifies how and when the performance test and performance evaluation results are reported.
§ 63.7(h) Waiver of TestsYes.
§ 63.8(a)(1) Applicability of Monitoring RequirementsYes.
§ 63.8(a)(2) Performance SpecificationsYes.
§ 63.8(a)(3) [Reserved]
§ 63.8(a)(4) Monitoring with FlaresYes, except for flares subject to § 63.2450(e)(5) .
§ 63.8(b)(1) MonitoringYes.
§ 63.8(b)(2)-(3) Multiple Effluents and Multiple Monitoring SystemsYes.
§ 63.8(c)(1) Monitoring System Operation and MaintenanceYes.
§ 63.8(c)(1)(i) Routine and Predictable SSMYes, before August 12, 2023. No, beginning on and after August 12, 2023.
§ 63.8(c)(1)(ii) CMS malfunction not in SSM planYes.
§ 63.8(c)(1)(iii) Compliance with Operation and Maintenance RequirementsYes, before August 12, 2023. No, beginning on and after August 12, 2023.
§ 63.8(c)(2)-(3) Monitoring System InstallationYes.
§ 63.8(c)(4) CMS RequirementsOnly for CEMS. Requirements for CPMS are specified in referenced subparts G and SS of this part. Requirements for COMS do not apply because this subpart does not require continuous opacity monitoring systems (COMS).
§ 63.8(c)(4)(i) COMS Measurement and Recording FrequencyNo; this subpart does not require COMS.
§ 63.8(c)(4)(ii) CEMS Measurement and Recording FrequencyYes.
§ 63.8(c)(5) COMS Minimum ProceduresNo. This subpart does not contain opacity or VE limits.
§ 63.8(c)(6) CMS RequirementsOnly for CEMS; requirements for CPMS are specified in referenced subparts G and SS of this part. Requirements for COMS do not apply because this subpart does not require COMS.
§ 63.8(c)(7)-(8) CMS RequirementsOnly for CEMS. Requirements for CPMS are specified in referenced subparts G and SS of this part. Requirements for COMS do not apply because this subpart does not require COMS.
§ 63.8(d)(1) CMS Quality ControlOnly for CEMS.
§ 63.8(d)(2) CMS Quality ControlOnly for CEMS.
§ 63.8(d)(3) CMS Quality ControlYes, only for CEMS before August 12, 2023. No, beginning on and after August 12, 2023. See § 63.2450(j)(6) .
§ 63.8(e) CMS Performance EvaluationOnly for CEMS, except this subpart specifies how and when the performance evaluation results are reported. Section 63.8(e)(5)(ii) does not apply because this subpart does not require COMS.
§ 63.8(f)(1)-(5) Alternative Monitoring MethodYes, except you may also request approval using the precompliance report.
§ 63.8(f)(6) Alternative to Relative Accuracy TestOnly applicable when using CEMS to demonstrate compliance, including the alternative standard in § 63.2505 .
§ 63.8(g)(1)-(4) Data ReductionOnly when using CEMS, including for the alternative standard in § 63.2505 , except that the requirements for COMS do not apply because this subpart has no opacity or VE limits, and § 63.8(g)(2) does not apply because data reduction requirements for CEMS are specified in § 63.2450(j) .
§ 63.8(g)(5) Data ReductionNo. Requirements for CEMS are specified in § 63.2450(j) . Requirements for CPMS are specified in referenced subparts G and SS of this part.
§ 63.9(a) Notification RequirementsYes.
§ 63.9(b)(1)-(5) Initial NotificationsYes.
§ 63.9(c) Request for Compliance ExtensionYes.
§ 63.9(d) Notification of Special Compliance Requirements for New SourceYes.
§ 63.9(e) Notification of Performance TestYes.
§ 63.9(f) Notification of VE/Opacity TestNo.
§ 63.9(g) Additional Notifications When Using CMSOnly for CEMS. Section 63.9(g)(2) does not apply because this subpart does not require COMS.
63.9(h)(1)-(6)Notification of Compliance StatusYes, except § 63.9(h)(2)(i)(A) through (G) and (h)(2)(ii) do not apply because § 63.2520(d) specifies the required contents and due date of the notification of compliance status report.
§ 63.9(i) Adjustment of Submittal DeadlinesYes.
§ 63.9(j) Change in previous informationYes, for change in major source status, otherwise § 63.2520(e) specifies reporting requirements for process changes.
§ 63.9(k) Electronic reporting proceduresYes, as specified in § 63. 9(j).
§ 63.10(a) Recordkeeping/ReportingYes.
§ 63.10(b)(1) Recordkeeping/ReportingYes.
§ 63.10(b)(2)(i) Records related to startup and shutdownNo, see §§ 63.2450(e) and 63.2525 for recordkeeping requirements.
§ 63.10(b)(2)(ii) Recordkeeping relevant to SSM periods and CMSYes, before August 12, 2023. No, beginning on and after August 12, 2023. See § 63.2525(h) and (l) .
§ 63.10(b)(2)(iii) Records related to maintenance of air pollution control equipmentYes.
§ 63.10(b)(2)(iv) and (v) Recordkeeping relevant to SSM periodYes, before August 12, 2023. No, beginning on and after August 12, 2023.
§ 63.10(b)(2)(vi) CMS RecordsBefore August 12, 2023, yes but only for CEMS; requirements for CPMS are specified in referenced subparts G and SS of this part. Beginning on and after August 12, 2023, yes for CEMS and CPMS for flares subject to § 63.2450(e)(5) .
§ 63.10(b)(2)(x) and (xi) CMS RecordsOnly for CEMS; requirements for CPMS are specified in referenced subparts G and SS of this part.
§ 63.10(b)(2)(vii)-(ix) RecordsYes.
§ 63.10(b)(2)(xii) RecordsYes.
§ 63.10(b)(2) (xiii)RecordsOnly for CEMS.
§ 63.10(b)(2)(xiv) RecordsYes.
§ 63.10(b)(3) RecordsYes.
§ 63.10(c)(1)-(6),(9)-(14) RecordsOnly for CEMS. Recordkeeping requirements for CPMS are specified in referenced subparts G and SS of this part.
§ 63.10(c)(7)-(8) RecordsNo. Recordkeeping requirements are specified in § 63.2525 .
§ 63.10(c)(15) RecordsYes, before August 12, 2023, but only for CEMS. No, beginning on and after August 12, 2023.
§ 63.10(d)(1) General Reporting RequirementsYes.
§ 63.10(d)(2) Report of Performance Test ResultsYes, before October 13, 2020. No, beginning on and after October 13, 2020.
§ 63.10(d)(3) Reporting Opacity or VE ObservationsNo.
§ 63.10(d)(4) Progress ReportsYes.
§ 63.10(d)(5)(i) Periodic Startup, Shutdown, and Malfunction ReportsNo, § 63.2520(e)(4) and (5) specify the SSM reporting requirements.
§ 63.10(d)(5)(ii) Immediate SSM ReportsNo.
§ 63.10(e)(1) Additional CEMS ReportsYes.
§ 63.10(e)(2)(i) Additional CMS ReportsOnly for CEMS, except this subpart specifies how and when the performance evaluation results are reported.
§ 63.10(e)(2)(ii) Additional COMS ReportsNo. This subpart does not require COMS.
§ 63.10(e)(3) ReportsNo. Reporting requirements are specified in § 63.2520 .
§ 63.10(e)(3)(i)-(iii) ReportsNo. Reporting requirements are specified in § 63.2520 .
§ 63.10(e)(3)(iv)-(v) Excess Emissions ReportsNo. Reporting requirements are specified in § 63.2520 .
§ 63.10(e)(3)(iv)-(v) Excess Emissions ReportsNo. Reporting requirements are specified in § 63.2520 .
§ 63.10(e)(3)(vi) -(viii)Excess Emissions Report and Summary ReportNo. Reporting requirements are specified in § 63.2520 .
§ 63.10(e)(4) Reporting COMS dataNo.
§ 63.10(f) Waiver for Recordkeeping/ReportingYes.
§ 63.11 Control device requirements for flares and work practice requirements for equipment leaksYes, except for flares subject to § 63.2450(e)(5) .
§ 63.12 DelegationYes.
§ 63.13 AddressesYes.
§ 63.14 Incorporation by ReferenceYes.
§ 63.15 Availability of InformationYes.

40 C.F.R. §Table 12 to Subpart FFFF of Part 63

85 FR 49164, Aug. 12, 2020, as amended at 85 FR 73903, Nov. 19, 2020; 89 FR 23873, Apr. 4, 2024
85 FR 49164, 8/12/2020; 85 FR 73903, 1/19/2021; 89 FR 23873, 4/4/2024