Where:
Rc is the converter arsenic charging rate, kg/hr (lb/hr).
Ac is the monthly average weight percent of arsenic in the copper matte charged during the month(%) as determined under paragraph (f)(2) of this section.
Al is the monthly average weight percent of arsenic in the lead matte charged during the month(%) as determined under paragraph (f)(2) of this section.
Wci is the total rate of copper matte charged to a copper converter during the month, kg (lb).
Wli is the total rate of lead matte charged to a copper converter during the month, kg (lb).
Hc is the total number of hours the copper converter department was in operation during the month (hr).
n is the number of copper converters in operation during the month.
40 C.F.R. §61.174