34 C.F.R. § 75.610

Current through October 31, 2024
Section 75.610 - Title to site

A grantee must have or obtain a full title or other interest in the site (such as a long-term lease), including right of access, that is sufficient to ensure the grantee's undisturbed use and possession of the facilities for at least 25 years after completion of the project or for the useful life of the construction, whichever is longer.

34 C.F.R. §75.610

Authority: 20 U.S.C. 1221e-3 and 3474

89 FR 70332 , 9/30/2024