34 C.F.R. § 75.605

Current through March 31, 2024
Section 75.605 - Beginning the construction
(a) A grantee shall begin work on construction within a reasonable time after the grant for the construction is made.
(b) Before construction is advertised or placed on the market for bidding, the grantee shall get approval by the Secretary of the final working drawings and specifications.

34 C.F.R. §75.605

Authority: 20 U.S.C. 1221e-3 and 3474