33 C.F.R. § 117.979

Current through October 31, 2024
Section 117.979 - Sabine Lake

The draw of the S82 bridge, mile 10.0 at Port Arthur, shall open on signal; except that, from 9 p.m. to 5 a.m., the draw shall open on signal if at least six hours notice is given to the Maintenance Construction Supervisor or the Maintenance Foreman at Port Arthur.

33 C.F.R. §117.979