33 C.F.R. § 117.758

Current through October 31, 2024
Section 117.758 - Tuckahoe River

The draw of the State highway bridge, mile 8.0 at Tuckahoe, shall open on signal if at least 24 hours notice is given.

33 C.F.R. §117.758

CGD82-025, 49 FR 17452, Apr. 24, 1984. Redesignated by CGD05-06-045, 71 FR 59383 , Oct. 10, 2006