Current through October 31, 2024
Section 117.621 - West BayThe draw of the West Bay Bridge, mile 1.2, at Osterville, shall operate as follows:
(a) From November 1 through April 30, the draw shall open on signal if at least a twenty-four hours advance notice is given.(b) From May 1 through June 15, the draw shall open on signal from 8 a.m. to 6 p.m.(c) From June 16 through September 30, the draw shall open on signal from 7 a.m. to 9 p.m.(d) From October 1 through October 31, the draw shall open on signal from 8 a.m. to 6 p.m.(e) At all other times from May 1 through October 31, the draw shall open on signal if at least a four-hours advance notice is given by calling the number posted at the bridge.USCG-2018-0874, 84 FR 30879 , June 28, 2019 USCG-2018-0874, 84 FR 30879, 6/28/2019