33 C.F.R. § 117.155

Current through November 30, 2024
Section 117.155 - Eureka Slough

The drawspan for the Northwestern Pacific Railroad Authority Drawbridge, mile 0.3 at Eureka, need not be opened for the passage of vessels. The owner or agency controlling the drawbridge must restore the drawspan to full operation within six months of notification from the District Commander.

33 C.F.R. §117.155

USCG-2001-10881, 71 FR 70309 , Dec. 4, 2006