Current through October 31, 2024
Section 651.10 - Actions requiring environmental analysisThe general types of proposed actions requiring environmental impact analysis under NEPA, unless categorically excluded or otherwise included in existing NEPA documentation, include:
(a) Policies, regulations, and procedures (for example, Army and installation regulations).(b) New management and operational concepts and programs, including logistics; RDT& E; procurement; personnel assignment; real property and facility management (such as master plans); and environmental programs such as Integrated Natural Resource Management Plan (INRMP), Integrated Cultural Resources Management Plan (ICRMP), and Integrated Pest Management Plan. NEPA requirements may be incorporated into other Army plans in accordance with 40 CFR 1506.4 .(c) Projects involving facilities construction.(d) Operations and activities including individual and unit training, flight operations, overall operation of installations, or facility test and evaluation programs.(e) Actions that require licenses for operations or special material use, including a Nuclear Regulatory Commission (NRC) license, an Army radiation authorization, or Federal Aviation Administration air space request (new, renewal, or amendment), in accordance with AR 95-50.(f) Materiel development, operation and support, disposal, and/or modification as required by DOD 5000.2-R.(g) Transfer of significant equipment or property to the ARNG or Army Reserve.(h) Research and development including areas such as genetic engineering, laser testing, and electromagnetic pulse generation.(i) Leases, easements, permits, licenses, or other entitlement for use, to include donation, exchange, barter, or Memorandum of Understanding (MOU). Examples include grazing leases, grants of easement for highway right-of-way, and requests by the public to use land for special events such as air shows or carnivals.(j) Federal contracts, grants, subsidies, loans, or other forms of funding such as Government-Owned, Contractor-Operated (GOCO) industrial plants or housing and construction via third-party contracting.(k) Request for approval to use or store materials, radiation sources, hazardous and toxic material, or wastes on Army land. If the requester is non-Army, the responsibility to prepare proper environmental documentation may rest with the non-Army requester, who will provide needed information for Army review. The Army must review and adopt all NEPA documentation before approving such requests.(l) Projects involving chemical weapons/munitions.