You must submit: | Details and/or additional requirements: |
(1) Safety analysis flow diagram (API RP 14C, Annex B) and Safety Analysis Function Evaluation (SAFE) chart (API RP 14C, section 6.3.3 ) (incorporated by reference in § 250.198 ) | Your safety analysis flow diagram must show the following: (i) Well shut-in tubing pressure; (ii) Pressure relieving device set points; (iii) Size, capacity, and design working pressures of separators, flare scrubbers, heat exchangers, treaters, storage tanks, compressors, and metering devices; |
(iv) Size, capacity, design working pressures, and maximum discharge pressure of hydrocarbon-handling pumps; | |
(v) Size, capacity, and design working pressures of hydrocarbon-handling vessels, and chemical injection systems handling a material having a flash point below 100 degrees Fahrenheit for a Class I flammable liquid as described in API RP 500 and API RP 505 (both incorporated by reference in § 250.198 ); and | |
(vi) Piping sizes and maximum allowable working pressures as determined in accordance with API RP 14E (incorporated by reference in § 250.198 ), including the locations of piping specification breaks. | |
(2) Electrical one-line diagram; | Showing elements including generators, circuit breakers, transformers, bus bars, conductors, automatic transfer switches, uninterruptable power supply (UPS) and associated battery banks, dynamic (motor) loads, and static loads (e.g., electrostatic treater grid, lighting panels). You must also include a functional legend. |
(3) Area classification diagram; | A plan for each platform deck and outlining all classified areas. You must classify areas according to API RP 500 or API RP 505 (both incorporated by reference in § 250.198 ). The plan must contain: (i) All major production equipment, wells, and other significant hydrocarbon and class 1 flammable sources, and a description of the type of decking, ceiling, walls (e.g., grating or solid), and firewalls; and (ii) The location of generators and any buildings (e.g., control rooms and motor control center (MCC) buildings) or major structures on the platform. |
(4) A piping and instrumentation diagram, for new facilities; | A detailed flow diagram which shows the piping and vessels in the process flow, together with the instrumentation and control devices. |
(5) The service fee listed in § 250.125 ; | The fee you must pay will be determined by the number of components involved in the review and approval process. |
Diagram: | Details and/or additional requirements: |
(1) Additional electrical system information; | (i) Cable tray/conduit routing plan that identifies the primary wiring method (e.g., type cable, cable schedule, conduit, wire); and |
(ii) Panel board/junction box location plan, if this information is not shown on the area classification diagram required in paragraph (a)(3) of this section. | |
(2) Schematics of the fire and gas-detection systems; | Showing a functional block diagram of the detection system, including the electrical power supply and also including the type, location, and number of detection sensors; the type and kind of alarms, including emergency equipment to be activated; and the method used for detection. |
(3) Revised piping and instrumentation diagram for existing facilities; | A detailed flow diagram which shows the piping and vessels in the process flow, together with the instrumentation and control devices. |
30 C.F.R. §250.842