30 C.F.R. § 250.603

Current through November 30, 2024
Section 250.603 - Emergency shutdown system

When well-workover operations are conducted on a well with the tree removed, an emergency shutdown system (ESD) manually controlled station shall be installed near the driller's console or well-servicing unit operator's work station, except when there is no other hydrocarbon-producing well or other hydrocarbon flow on the platform.

30 C.F.R. §250.603