30 C.F.R. § 250.433

Current through October 31, 2024
Section 250.433 - What are the diverter actuation and testing requirements?

When you install the diverter system, you must actuate the diverter sealing element, diverter valves, and diverter-control systems and control stations. You must also flow-test the vent lines.

(a) For drilling operations with a surface wellhead configuration, you must actuate the diverter system at least once every 24-hour period after the initial test. After you have nippled up on conductor casing, you must pressure-test the diverter-sealing element and diverter valves to a minimum of 200 psi. While the diverter is installed, you must conduct subsequent pressure tests within 7 days after the previous test.
(b) For floating drilling operations with a subsea BOP stack, you must actuate the diverter system within 7 days after the previous actuation. For subsequent testing, you may partially actuate the diverter element and a flow test is not required.
(c) You must alternate actuations and tests between control stations.

30 C.F.R. §250.433

76 FR 64462 , Oct. 18, 2011, as amended at 84 FR 21975 , May 15, 2019
84 FR 21975 , 7/15/2019