Current through November 30, 2024
Section 250.229 - What must the New or Unusual Technology Barrier Equipment Conceptual Plan include?Your New or Unusual Technology Barrier Equipment Conceptual Plan must include the following information:
(a) A description how the New or Unusual Technology Barrier Equipment Conceptual Plan fits within your overall site-specific project, if applicable. You must include an overview of the project development concepts and a proposed schedule for submittal of associated Conceptual Plans;(b) Detailed schematics depicting the primary and secondary barriers that include all components, assemblies, or sub-assemblies, each labeled and categorized as a Category 1 barrier or Category 2 barrier;(c) A list of the primary and secondary barriers that includes all components, assemblies, or sub-assemblies specifying each assigned barrier as either a Category 1 barrier or Category 2 barrier;(d) A list of the engineering standards that will be used in the equipment's material selection and qualification, design verification analysis, and design validation testing;(e) A list of requested alternate procedures or equipment in accordance with § 250.141 and requested departures in accordance with § 250.142 needed for the new or unusual technology barrier equipment proposed in your New or Unusual Technology Barrier Equipment Conceptual Plan;(f) A list of the functional requirements (e.g., environmental and physical loads (magnitude and frequency)) for which the barrier equipment is being designed;(g) A description of the equipment's safety critical functions, (e.g., function(s) performed by or inherent to the equipment enabling it to achieve or maintain a safe state);(h) An I3P nomination, in accordance with § 250.231(a);(i) An I3P verification plan that includes the following: (1) A discussion of the equipment's material selection and qualification;(2) A discussion of the equipment's design verification analyses;(3) A discussion of the equipment's design validation testing;(4) An explanation of why the analyses, processes, and procedures ensure that the equipment is fit for service in the applicable environment; and(5) Details regarding how the I3P will address the additional items listed in § 250.232.(j) Documentation demonstrating payment of the service fee listed in § 250.125 .