23 C.F.R. § 750.307

Current through October 31, 2024
Section 750.307 - FHWA project approval

Authorization to proceed with acquisitions on a sign removal project shall not be issued until such time as the State has submitted to FHWA the following:

(a) A general description of the project.
(b) The total number of signs to be acquired.
(c) The total estimated cost of the sign removal project, including a breakdown of incidental, acquisition and removal costs.

23 C.F.R. § 750.307