23 C.F.R. § 635.307

Current through May 31, 2024
Section 635.307 - Coordination
(a) The right-of-way clearance, utility, and railroad work are to be so coordinated with the physical construction that no unnecessary delay or cost for the physical construction will occur.
(b) All right-of-way clearance, utility, and railroad work performed separately from the contract for the physical construction of the project are to be accomplished in accordance with provisions of the following:
(1) 23 CFR part 140, subpart I;
(2) 23 CFR part 646, subpart B;
(3)23 CFR 710.403 ; and
(4) 23 CFR part 645 , subpart A.

23 C.F.R. §635.307

40 FR 17251, Apr. 18, 1975, as amended at 40 FR 25585, June 17, 1975; 64 FR 71289, Dec. 21, 1999