Current through September 30, 2024
Section 115.38 - ApplicationA written request for approval of a container after manufacture may be made by the owner or operator to a Certifying Authority and must include the following:
(a) Three copies, each no longer than 3 feet by 4 feet, of the Customs and TIR/Container plan;(b) Customs and TIR/Container plan number;(c) Three copies of the specifications which include the following information: (2) Name and business address of applicant;(3) Identification marks and numbers;(5) Nominal overall dimensions in centimeters;(6) Type of construction and essential particulars of structure (nature of materials, coating system used, parts which are reinforced, whether bolts are riveted or welded, and similar matters); and(7) Proposed location and date for inspection of the container.