The Water Resources Program will be prepared and considered by the Commission for adoption annually. Projects required to satisfy the basin needs during the period covered by the Program may be classified as follows:
18 C.F.R. §401.24
The Water Resources Program will be prepared and considered by the Commission for adoption annually. Projects required to satisfy the basin needs during the period covered by the Program may be classified as follows:
18 C.F.R. §401.24