18 C.F.R. § 11.13

Current through November 30, 2024
Section 11.13 - Energy gains calculations
(a)Energy gains at a downstream project.
(1) Energy gains at a downstream project are determined by simulating operation of the downstream project with and without the effects of the headwater project. Except for determinations which are not complex or in which headwater benefits are expected to be small, calculations will be made by application of the Headwater Benefits Energy Gains Model, as presented in The Headwater Benefits Energy Gains (HWBEG) Model Description and Users Manual, which is available for the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Road, Springfield, VA 22161.
(2) If more than one headwater project provide energy gains to a downstream project, the energy gains at the downstream project are attributed to the headwater projects according to the time sequence of commencement of operation in which each headwater project provided energy gains at the downstream project, by:
(i) Crediting the headwater project that is first in time with the amount of energy gains that it provided to the downstream project prior to operation of the headwater project that is next in time; and
(ii) Crediting any subsequent headwater project with the additional increment of energy gains provided by it to the downstream project.
(3) Annual energy losses at a downstream project, or group of projects owned by the same entity, that are attributable to the headwater project will be subtracted from energy gains for the same annual period at the downstream project or group of projects. A net loss in one calendar year will be subtracted from net gains in subsequent years until no net loss remains.
(b)Energy generated at the headwater project.
(1) Except as provided in paragraphs (b)(2) and (b)(3) of this section, the portion of the total annual energy generation at the headwater project that is to be attributed to the joint-use power cost is derived by multiplying the total annual generation at the headwater project and the ratio of the project investment cost assigned to the joint-use power cost to the sum of the investment cost assigned to both the specific power cost and the joint-use power cost of the headwater project, as follows:

View Image

In which:

Ej = annual energy generated at the headwater project to be attributed to the joint-use power cost,

E = total annual generation at the headwater project,

Cj = project investment costs assigned to the joint-use power cost, and

Cs = project investment costs assigned to specific power costs.

(2) If the headwater project contains a pumped storage facility, calculation of the portion of the total annual energy generation at the headwater project that is attributable to the joint-use power cost will be determined on a case-by-case basis.
(3) If no power is generated at the headwater project, the amount of energy attributable to the joint-use power cost under this section is the total of all downstream energy gains included in the headwater benefits formula.

18 C.F.R. §11.13