14 C.F.R. § 440.7

Current through November 30, 2024
Section 440.7 - Determination of maximum probable loss
(a) The FAA will determine the maximum probable loss (MPL) from covered claims by a third party for bodily injury or property damage, and the United States, its agencies, and its contractors and subcontractors for covered property damage or loss, resulting from a permitted or licensed activity. The maximum probable loss determination forms the basis for financial responsibility requirements issued in a license or permit order.
(b) The FAA issues its determination of maximum probable loss no later than ninety days after a licensee or permittee has requested a determination and submitted all information required by the FAA to make the determination. The FAA will consult with Federal agencies that are involved in, or whose personnel or property are exposed to risk of damage or loss as a result of, a licensed or permitted activity before issuing a license or permit order prescribing financial responsibility requirements, and shall notify the licensee, or permittee, if interagency consultation may delay issuance of the MPL determination.
(c) Appendix A of this part contains information requirements for obtaining a maximum probable loss determination. Any person requesting a determination of maximum probable loss must submit the information required by Appendix A, unless the FAA has waived a requirement. In lieu of submitting required information, a person requesting a maximum probable loss determination may designate and certify certain information previously submitted for a prior determination as complete, valid, and equally applicable to its current request. The requester is responsible for the continuing accuracy and completeness of information submitted under this part and must promptly report any changes in writing.
(d) The FAA will amend a determination of maximum probable loss required under this section at any time prior to completion of licensed or permitted activities as warranted by supplementary information provided to or obtained by the FAA after the MPL determination is issued. Any change in financial responsibility requirements as a result of an amended MPL determination shall be set forth in a license or permit order.
(e) The FAA may make a determination of maximum probable loss at any time other than as set forth in paragraph (b) of this section upon request by any person.

14 C.F.R. §440.7