Current through September 30, 2024
Section 851.31 - Variance process(a)Application. Contractors desiring a variance from a safety and health standard, or portion thereof, may submit a written application containing the information in paragraphs (c) and (d) of this section to the appropriate CSO.(1) The CSO may forward the application to the EHSS Director.(2) If the CSO does not forward the application to the EHSS Director, the CSO must return the application to the contractor with a written statement explaining why the application was not forwarded.(3) Upon receipt of an application from a CSO, the EHSS Director must review the application for a variance and make a written recommendation to: (i) Approve the application;(ii) Approve the application with conditions; or(iii) Deny the application.(b)Defective applications. If an application submitted pursuant to § 851.31(a) is determined by the EHSS Director to be incomplete, the EHSS Director may: (1) Return the application to the contractor with a written explanation of what information is needed to permit consideration of the application; or(2) Request the contractor to provide necessary information.(c)Content. All variance applications submitted pursuant to paragraph (a) of this section must include: (1) The name and address of the contractor;(2) The address of the DOE site or sites involved;(3) A specification of the standard, or portion thereof, from which the contractor seeks a variance;(4) A description of the steps that the contractor has taken to inform the affected workers of the application, which must include giving a copy thereof to their authorized representative, posting a statement, giving a summary of the application and specifying where a copy may be examined at the place or places where notices to workers are normally posted; and(5) A description of how affected workers have been informed of their right to petition the EHSS Director or designee for a conference; and(6) Any requests for a conference, as provided in § 851.34 .(d)Types of variances. Contractors may apply for the following types of variances: (1)Temporary variance. Applications for a temporary variance pursuant to paragraph (a) of this section must be submitted at least 30 days before the effective date of a new safety and health standard and, in addition to the content required by paragraph (c) of this section, must include:(i) A statement by the contractor explaining the contractor is unable to comply with the standard or portion thereof by its effective date and a detailed statement of the factual basis and representations of qualified persons that support the contractor's statement;(ii) A statement of the steps the contractor has taken and plans to take, with specific dates if appropriate, to protect workers against the hazard covered by the standard;(iii) A statement of when the contractor expects to be able to comply with the standard and of what steps the contractor has taken and plans to take, with specific dates if appropriate, to come into compliance with the standard;(iv) A statement of the facts the contractor would show to establish that:(A) The contractor is unable to comply with the standard by its effective date because of unavailability of professional or technical personnel or materials and equipment needed to come into compliance with the standard or because necessary construction or alteration of facilities cannot be completed by the effective date;(B) The contractor is taking all available steps to safeguard the workers against the hazards covered by the standard; and(C) The contractor has an effective program for coming into compliance with the standard as quickly as practicable.(2)Permanent variance. An application submitted for a permanent variance pursuant to paragraph (a) of this section must, in addition to the content required in paragraph (c) of this section, include: (i) A description of the conditions, practices, means, methods, operations, or processes used or proposed to be used by the contractor; and(ii) A statement showing how the conditions, practices, means, methods, operations, or processes used or proposed to be used would provide workers a place of employment which is as safe and healthful as would result from compliance with the standard from which a variance is sought.(3)National defense variance.(i) An application submitted for a national defense variance pursuant to paragraph (a) of this section must, in addition to the content required in paragraph (c) of this section, include:(A) A statement by the contractor showing that the variance sought is necessary to avoid serious impairment of national defense; and(B) A statement showing how the conditions, practices, means, methods, operations, or processes used or proposed to be used would provide workers a safe and healthful place of employment in a manner that, to the extent practical taking into account the national defense mission, is consistent with the standard from which a variance is sought.(ii) A national defense variance may be granted for a maximum of six months, unless there is a showing that a longer period is essential to carrying out a national defense mission.71 FR 6931, Feb. 9, 2006; 71 FR 36661, June 28, 2006, as amended at 71 FR 68733, Nov. 28, 2006; 80 FR 5009, Jan. 30, 2015; 88 FR 41293, June 26, 2023