If the contractor fails to operate at least 98 percent of the minimum days of operation required in its contract, ceases operation or the contract is terminated prior to the end of the contract period, the maximum reimbursable amount shall be reduced in proportion to the percentage of the contract minimum days of operation that the contractor was not in operation.
Cal. Code Regs. Tit. 5, § 17813
Note: Authority cited: Sections 8231 and 8247, Education Code. Reference: Section 8247, Education Code.