The time limits specified in Section 6156 may be extended for good cause by the public entity.
Cal. Code Regs. Tit. 25, § 6162
The time limits specified in Section 6156 may be extended for good cause by the public entity.
Cal. Code Regs. Tit. 25, § 6162