Cal. Code Regs. tit. 25 § 1020.7

Current through Register 2024 Notice Reg. No. 45, November 8, 2024
Section 1020.7 - Permit Fees for Park Construction or Alteration
(a) Any person submitting an application for a permit to construct with plans not having a department standard plan approval, shall pay the following fees, as applicable:
(1) Permit Fee. For the purpose of determining fees, the enforcement agency may establish the permit fee in accordance with subsection (f) of this section as appropriate. The minimum permit fee shall be two hundred thirty-eight dollars ($238) for the first whole hour or fractional part thereof of inspection time. When the inspection time exceeds one hour, the following fees shall apply:
(A) Second and subsequent whole hours: one hundred two dollars ($102).
(B) Each thirty (30) minutes, or fractional part thereof: fifty-one dollars ($51).
(2) Plan Check Fee. One-half ( 1/2) of the combined total of construction, mechanical, plumbing, and electrical permit fees identified in Table A of this section. The minimum plan check fee shall be two hundred twenty-three dollars ($223).
(b) Reinspection fee: Two hundred twenty-three dollars ($223) for the first whole hour or fractional part thereof of reinspection time. When the reinspection time exceeds one hour, the following fees shall apply:
(1) Second and subsequent whole hours: one hundred two dollars ($102).
(2) Each thirty (30) minutes, or fractional part thereof: fifty-one dollars ($51).
(c) When any person files applications simultaneously to construct two (2) or more permanent buildings, or accessory buildings or structures which are identical and are within the same park, only one (1) plan check fee shall be required.
(d) Electrical, mechanical, and plumbing permit fees shall not exceed those contained in this chapter.
(e) When plans and specifications fail to comply with the requirements of this chapter, the enforcement agency shall notify the applicant in writing, stating in what respects the plans do not comply. The applicant shall correct the plans and/or specifications and resubmit them to the enforcement agency. The following fees are required for each resubmission of plans or specifications subsequent to the initial plan check:
(1) Plan Check Fee: Two hundred twenty-three dollars ($223) for the first whole hour or fractional part thereof of plan check time. When the plan check time exceeds one hour, the following fees shall apply:
(A) Second and subsequent whole hours: one hundred nine dollars ($109).
(B) Each thirty (30) minutes, or fractional part thereof: fifty-four dollars ($54).
(f) Permit fees for a permit to construct accessory buildings or structures without a standard plan approval from the department, and foundation systems, permanent buildings, and/or electrical, mechanical, and plumbing installations within or on permanent buildings, or accessory buildings or structures shall be the sum of the applicable fees in Table A of this section.
(1) Table A. Construction, Mechanical, Electrical, and Plumbing Permit Fees.

Total Valuation..........................Fee
$50,000 or less..........................$306.00 for the first $1,000 plus $13.00 for each additional thousand or fraction thereof, to and including $50,000.
$50,001 to $100,000..........................$503.00 for the first $50,000 plus $9.00 for each additional thousand or fraction thereof, to and including $100,000.
$100,001 to $500,000..........................$776.50 for the first $100,000 plus $7.00 for each additional thousand or fraction thereof, to and including $500,000.
$500,001 to $1,000,000..........................$2,476.00 for the first $500,000 plus $6.00 for each additional thousand or fraction thereof, to and including $1,000,000.
$1,000,001 and up..........................$4,297.00 for the first $1,000,000 plus $4.00 for each additional thousand or fraction thereof.

Cal. Code Regs. Tit. 25, § 1020.7

Note: Authority cited: Sections 18300, 18502.5 and 18552, Health and Safety Code. Reference: Sections 18502, 18502.5 and 18503, Health and Safety Code.

Note: Authority cited: Sections 18300, 18502.5 and 18552, Health and Safety Code. Reference: Sections 18502, 18502.5 and 18503, Health and Safety Code.

1. Renumbering of former section 1022 to new section 1020.7, including amendment of section heading and section, filed 7-6-2004; operative 7-6-2004 pursuant to Government Code section 11343.4 (Register 2004, No. 28).
2. Amendment filed 12-29-2005; operative 1-1-2006 pursuant to Government Code section 11343.4(Register 2005, No. 52).
3. Amendment filed 2-27-2024; operative 4/1/2024 (Register 2024, No. 9).