Current through Register 2024 Notice Reg. No. 24, June 14, 2024
(a) In addition to such other information as may be required, all reports shall contain permittee's or licensee's evaluation of the current potential for using reclaimed water or reusing water to satisfy all or part of the water needed.(b) If the terms of the permit or license require water conservation measures, the extent of implementation of such measures shall be reported.Cal. Code Regs. Tit. 23, § 848
1. Renumbering and amendment of Section 783 to Section 848 filed 1-16-87; effective thirtieth day thereafter (Register 87, No. 10). For prior history, see Register 77, No. 5. Note: Authority cited: Section 1058, Water Code. Reference: Section 275, Water Code; and Section 2, Article X, California Constitution.
1. Renumbering and amendment of Section 783 to Section 848 filed 1-16-87; effective thirtieth day thereafter (Register 87, No. 10). For prior history, see Register 77, No. 5.