Cal. Code Regs. tit. 23 § 846

Current through Register 2025 Notice Reg. No. 2, January 10, 2025
Section 846 - Measuring Devices and Statements

After issuance of a permit for surface diversion or storage or underground storage the permittee may be required to establish suitable measuring and recording devices and to obtain and furnish to the board such records as may be needed to determine with reasonable accuracy:

the quantity of water beneficially used; or

the quantity of water placed in storage and the quantity later recovered under the provisions of the permit. Permittee may also be required to determine and submit a written statement of the quantities beneficially used.

Cal. Code Regs. Tit. 23, § 846

1. Renumbering and amendment of Sections 785 and 786 to Section 846 filed 1-16-87; effective thirtieth day thereafter (Register 87, No. 10). For prior history, see Register 60, No. 5.

Note: Authority cited: Section 1058, Water Code. Reference: Section 2, Article X, California Constitution; and Sections 100, 275 and 1240, Water Code.

1. Renumbering and amendment of Sections 785 and 786 to Section 846 filed 1-16-87; effective thirtieth day thereafter (Register 87, No. 10). For prior history, see Register 60, No. 5.