Section 18 - Revisions in Plans(a) Any plan of work approved by the board may be changed or altered only with the consent of the board prior to the time of commencement or during progress of the work. A request for an amendment to a plan of work must be in the same form as an original application or in a form acceptable to the Chief Engineer.(b) Minor, insubstantial changes may be made in plans without the submission of a written request for an amendment; however, the permittee shall first notify the Chief Engineer of any change before commencing work on any changed work. A minor, insubstantial change must be one that is essentially consistent with the application or permit, consistent with board standards, and does not pose a threat to the adopted plan of flood control. The board reserves the right to require the applicant to file a written request for an amendment.Cal. Code Regs. Tit. 23, § 18
1. Renumbering and amendment of old section 18 to new section 7(a) and new section filed 9-30-96; operative 10-30-96 (Register 96, No. 40). For prior history, see Register 69, No. 25. Note: Authority cited: Section 8571, Water Code. Reference: Section 8721, Water Code.
1. Renumbering and amendment of old section 18 to new section 7(a) and new section filed 9-30-96; operative 10-30-96 (Register 96, No. 40). For prior history, see Register 69, No. 25.