The contingency plan shall be reviewed, and immediately amended, if necessary, whenever:
(a) applicable regulations are revised;(b) the plan fails in an emergency;(c) the facility changes in its design, construction, operation, maintenance, or other circumstances in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency;(d) the list of emergency coordinators changes; or(e) the list of emergency equipment changes.Cal. Code Regs. Tit. 22, § 66265.54
1. New section filed 5-24-91; operative 7-1-91 (Register 91, No. 22). Note: Authority cited: Sections 208, 25150 and 25159, Health and Safety Code. Reference: Sections 25159 and 25159.5, Health and Safety Code; 40 CFR Section 265.54.
1. New section filed 5-24-91; operative 7-1-91 (Register 91, No . 22).