(f) Sample of Semimonthly Report.
SAMPLE OF INSPECTOR'S SEMIMONTHLY REPORT
To be made on 1st and 15th of each month
Period from December 1 to December 15, 1966
File No.____________
Application No.____
MR. JOHN DOE, Architect
Pasadena, California
Subject: Compton Heights Elementary School
DEAR SIR:
Following is my report on the progress of the above job:
The foundation of the East Wing is complete.
Forms for the foundations of the Library Section are ready for the pouring of concrete. Trenches for the south wall footings were lowered one foot as directed by James Wilson, Structural Engineer.
Excavations are complete and part of the forms are in place for the West Wing.
Thirty percent of the excavation and backfill has been completed. Reinforcing is in place for the footing of the brick wall of the arcade.
Where forms have been stripped from the concrete already poured the surfaces show good workmanship.
Progress of work is slow but is progressing as fast as can be expected with the class of labor that we have.
Change Orders Numbers 1 and 2 have been received and have been called to the attention of the Superintendent.
Very truly yours,
(Signed) RICHARD ROE, Inspector
123 Camino Road
Compton Heights
Copies
1 copy to Department of General Services
1 copy to Engineer
1 copy to School Board
(See Sections 37 and 42)