Cal. Code Regs. tit. 20 § 48

Current through Register 2025 Notice Reg. No. 2, January 10, 2025
Section 48 - (Rule 48) Extension of Time Limits. [Renumbered]

Cal. Code Regs. Tit. 20, § 48

1. Amendment filed 10-10-75; designated effective 9-30-75 by Resolution A-4423, see Section 11445, Gov. Code (Register 75, No. 41).
2. Change without regulatory effect filed 6-2-88; operative 6-2-88 (Register 88 No. 24).
3. Repealer and new section filed 6-9-95; operative 6-9-95. Submitted to OAL for printing only (Register 95, No. 23).
4. Amendment of section and NOTE filed 2-22-2005; operative 3-24-2005 (Register 2005, No. 8).
5. Renumbering of former section 48 to new section 11.6 filed 9-13-2006; operative 9-13-2006 pursuant to Government Code section 11351(a) (Register 2006, No. 37).

Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution. Reference: Section 1701, Public Utilities Code.

1. Amendment filed 10-10-75; designated effective 9-30-75 by Resolution A-4423, see Section 11445, Gov. Code (Register 75, No. 41).
2. Change without regulatory effect filed 6-2-88; operative 6-2-88 (Register 88 No. 24).
3. Repealer and new section filed 6-9-95; operative 6-9-95. Submitted to OAL for printing only (Register 95, No. 23).
4. Amendment of section and Note filed 2-22-2005; operative 3-24-2005 (Register 2005, No. 8).
5. Renumbering of former section 48 to new section 11.6 filed 9-13-2006; operative 9-13-2006 pursuant to Government Code section 11351(a) (Register 2006, No. 37).