(a) An operator shall notify the State Fire Marshal of any new construction or retrofit of a pipeline subject to this Article by filing Form PSD-103 with the State Fire Marshal Pipeline Safety Division at least 60 days before construction begins.Cal. Code Regs. Tit. 19, § 2114
1. New section filed 8-31-2020; operative 10-1-2020 (Register 2020, No. 36). Note: Authority cited: Sections 51010, 51013, 51013.5 and 51015, Government Code; and Sections 60104 and 60105, Title 49 of the United States Code. Reference: Sections 51010, 51010.5, 51013, 51013.1, 51013.5, 51015, 51015.4 and 51016, Government Code; and Sections 60104 and 60105, Title 49 of the United States Code.
1. New section filed 8-31-2020; operative 10/1/2020 (Register 2020, No. 36).