Cal. Code Regs. tit. 17 § 95980

Current through Register 2024 Notice Reg. No. 50, December 13, 2024
Section 95980 - Issuance of Registry Offset Credits
(a) One registry offset credit, which represents one metric ton of CO2e for a direct GHG emission reduction or direct GHG removal enhancement, will be issued pursuant to section 95980.1 only if:
(1) An Offset Project Registry has listed the offset project pursuant to section 95975;
(2) The GHG emission reductions or GHG removal enhancements were issued a Positive Offset or Qualified Positive Offset Verification Statement pursuant to sections 95977.1 and 95977.2; and
(3) An Offset Project Registry has received a Positive Offset or Qualified Positive Offset Verification Statement issued and attested to by an ARB-accredited verification body for the Offset Project Data Report for which registry offset credits would be issued.
(b) An Offset Project Registry will determine whether the GHG emission reductions and GHG removal enhancements meet the requirements of section 95980(a), the information submitted pursuant to section 95980(a) is complete, and the Positive Offset or Qualified Positive Offset Verification Statement meets the requirements of sections 95977, 95977.1, and 95977.2 within 45 calendar days of receiving it.
(c) Determination for Timing and Duration of Initial Crediting Periods for Offset Projects Submitted Through an Offset Project Registry. The initial crediting period will begin with the date that the first verified GHG emission reductions and GHG removal enhancements occur, according to the first Positive Offset or Qualified Positive Offset Verification Statement that is received by an Offset Project Registry, unless otherwise specified in the applicable Compliance Offset Protocol. An early action offset project that transitioned pursuant to the Program for Recognition of Early Action Offset Credits is considered to have begun its initial crediting period on the date that the first verified GHG emission reductions and GHG removal enhancements under a Compliance Offset Protocol took place according to the first Positive Offset or Qualified Positive Offset Verification Statement that was received by ARB.
(d) Determination for Timing and Duration of Renewed Crediting for Offset Projects Submitted through an Offset Project Registry. A renewed crediting period will begin the day after the conclusion of the prior crediting period.

Cal. Code Regs. Tit. 17, § 95980

1. New section filed 12-13-2011; operative 1-1-2012 pursuant to Government Code section 11343.4 (Register 2011, No. 50).
2. Change without regulatory effect amending subsection (b) filed 2-15-2012 pursuant to section 100, title 1, California Code of Regulations (Register 2012, No. 7).
3. Amendment of subsection (c) filed 6-26-2014; operative 7-1-2014 pursuant to Government Code section 11343.4(b)(3) (Register 2014, No. 26).
4. Amendment of subsection (c) filed 9-18-2017; operative 10-1-2017 pursuant to Government Code section 11343.4(b)(3) (Register 2017, No. 38).

Note: Authority cited: Sections 38510, 38560, 38562, 38570, 38571, 38580, 39600 and 39601, Health and Safety Code. Reference: Sections 38530, 38560.5, 38564, 38565, 38570 and 39600, Health and Safety Code.

1. New section filed 12-13-2011; operative 1-1-2012 pursuant to Government Code section 11343.4 (Register 2011, No. 50).
2. Change without regulatory effect amending subsection (b) filed 2-15-2012 pursuant to section 100, title 1, California Code of Regulations (Register 2012, No. 7).
3. Amendment of subsection (c) filed 6-26-2014; operative 7/1/2014 pursuant to Government Code section 11343.4(b)(3) (Register 2014, No. 26).
4. Amendment of subsection (c) filed 9-18-2017; operative 10/1/2017 pursuant to Government Code section 11343.4(b)(3) (Register 2017, No. 38).