Cal. Code Regs. tit. 16 § 883

Current through Register 2025 Notice Reg. No. 2, January 10, 2025
Section 883 - Order of Correction-Extension of Time to Correct

If the cited person, after exercising substantial efforts and reasonable diligence, is unable to complete the correction within the time allowed because of conditions beyond his control, he may request an extension of time in which to correct. Such request must be made in writing, and must be made prior to the expiration of the time allowed in the order of correction. An extension may be granted upon showing of good cause which determination is within the discretion of the Registrar. If a request for extension of time is not made prior to the expiration of time allowed in the order of correction, failure to correct within the time allowed shall constitute a violation of the order of correction whether or not good cause for an extension of time existed.

Cal. Code Regs. Tit. 16, § 883

1. Editorial correction (Register 2017, No. 8).

Note: Authority cited: Sections 7008 and 7099.1, Business and Professions Code. Reference: Sections 7099 and 7099.1, Business and Professions Code.

1. Editorial correction (Register 2017, No. 8).